Spiral piling machinery for foundation project

The spiral piling machine is base on the excavator system, which can complete digging and drilling work by different work device - details see: https://www.machineto.com/spiral-piling-machinery-for-foundation-project-10099133
Place of Origin:Henan China (Mainland)Brand Name:ORANGEModel Number:ORANGE SPM-01After-sales Service Provided:Engineers available to service machinery overseas
Spiral piling machinery color:blue   
Spiral piling machinery for foundation project
contact supplier for Spiral piling machinery for foundation project


Spiral piling machinery Quick Details

Condition:NewPlace of Origin:Hunan China (Mainland)Brand Name:ORANGE
Model Number:SPM-01Dimension state::5500x1400x3000mmGross weight::3000kgs
Capacity::

10000kgs

Specifications
The spiral piling machine is base on the excavator system, which can complete digging and drilling work by different work device

Easy and flexible operation: all actions including travel, dozer, turntable swing, work devices, pile rotation and feed etc. are all controlled by advanced hydraulic pilot valve. Work operation is in the cabin which can reduce operating force and operator's load and advance the control stability.

1. Drill frame angle display is fit in the cab, which make operation clearly.
2. The machine is supplying special clamping fixtures for piles, easy assembling and disassembling, high efficiency.
3. The machine is supplying pile guiding device which can ensure the verticality of pile drill.
4. Safety and reliable key parts: YANMAR-3TNV82A engine from Japan, hydraulic system main pump, main valve, swing motor, travel motor are all from KYB Janpa.

Pile Drilling Parameter

Drilling Diametermm76
Drilling Depthmm1800

Chassis

Wheel gaugemm1430
Track gaugemm1150
Crawler widthmm250
Grounding clearancemm280
Dozer lengthmm1400

Travel Capacity

Max. TractionKN19
(Max/Min)

Travel speed

Km/h4.7/2.6
Climbing capacity°20

Feed

Length of feeding beammm3400
Strokemm2000
Speedm/min2

Rotation

TorqueN.m1500
Speedrpm50

Engine

ModelYANMAR-3TNV82A
DisplacementL1.331
Power/Rev.kw/rpm16/2200
Fuel tank volumeL42.5
Turntable Swing°360
Dimension(L*W*H)mm5500X1400X3000
Machine Weightkg3000

Spiral piling machinery for foundation project
Packaging Detail:in container
Delivery Detail:25 days

Related Product for Spiral piling machinery for foundation project


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208