Highway Guardrail Metal Post Driver

Metal Post Driver:, install highway guardrails, install photovoltaic panel, install one steel post per 1-2 minutes - details see: https://www.machineto.com/highway-guardrail-metal-post-driver-10113532
Condition:NewEfficiency:High EfficiencyPiling Speed(m/min):1-2 m/min.Place of Origin:Jiangsu China (Mainland)
Brand Name:ROADSKYModel Number:Metal Post DriverWeight:2300 kgDimension(L*W*H):4000*2200*3600 mm
Certification:ISO 9001:2000After-sales Service Provided:Engineers available to service machinery overseasTow speed:Around 60 km/hMetal Post Driver:Highway Guardrail Metal Post Driver
Highway Guardrail Metal Post Driver
contact supplier for Highway Guardrail Metal Post Driver


Highway Guardrail Metal Post Driver

1. Functions

1.1 Pile Driving Function: YZ180 Highway Guardrail Post Driver and Extractor is intended for installing and maintaining the road safety barriers, especially be applicable for driving the road side crash barriers in newly constructing highways. It is also used for the photovoltaic installation, solar cells and solar panels installation.

1.2 Pile Extracting Function: With the same hydraulic system for extracting poorly driven or incorrectly positioned posts or road maintenance work, it is a professional machine for extracting the posts out of any conditions of ground.

2. Features

2.1 YZ180 Highway Guardrail Post Driver and Extractor is composed of chassis, upper column, press arm, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system, control system and pile extracting equipment. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency and low price.

2.2 The upper column is articulated with the main column. When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by articulate and disassemble the traveling roller chain. The up and down, longitudinal and transverse shift, horizontal slide of the column are realized through hydraulic system.

2.3 The hydraulic hammer is installed at the front end of the press arm. The press arm carries the hammer downward and upward along the track of the column for pile driving working by hydraulic system. You can not use the upward force of the hammer to extract the posts out of the ground directly or it may damage your machine, we suggest you to choose our professional Pile Extractor for extracting the posts out of any kind of ground.

2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.

2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.

2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.

3. Main Technical Specifications

TypeYZ180
Rated Power22 HP
Size (L×W×H)4000×2200×3600 mm
G.W.2300 KG
Weight of Hydraulic Hammer260 KG
Dia. Of Drill Shank65 mm
Hydraulic System Pressure16 Mpa
Hydraulic System Flow45-50 L/min.
Impulsive Pressure10-13 MPa
Impulsive Frequency5.8-13 Hz
Wheel Track1670 mm
Pile Driving Force per Stroke of HammerAround 200 KN
Pile Extracting ForceAround 200 KN
Working height of hydraulic hammer≤3000 mm
Traveling Speed0-15 km/h

Highway Guardrail Metal Post Driver
Packaging Detail:Metal Post Driver:Export and sea-worthy standard special packing
Delivery Detail:Metal Post Driver: 10days after receiving advance payment

Related Product for Highway Guardrail Metal Post Driver


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208