Highway Guard Rail Pile Driver Hammer

pile driver hammer:, install highway guardrails, install photovoltaic panel, high working efficiency, competitive price - details see: https://www.machineto.com/highway-guard-rail-pile-driver-hammer-10113529
Condition:NewEfficiency:HighPiling Speed(m/min):1-2 m/minPlace of Origin:Jiangsu China (Mainland)
Brand Name:ROADSKYModel Number:pile driver hammerWeight:2800 kgDimension(L*W*H):4290*2000*2620 mm
Certification:ISO 9001:2000After-sales Service Provided:Engineers available to service machinery overseaspile driver hammer:Highway Guard Rail Pile Driver Hammer 
Highway Guard Rail Pile Driver Hammer
contact supplier for Highway Guard Rail Pile Driver Hammer


Highway Guard Rail Pile Driver Hammer

1. Functions

1.1 Pile Driving Function: TDB230 Highway Guardrail Pile Driver and Extractor is intended for installing and maintaining the road safety barriers. It is also used for the photovoltaic installation, solar cells and solar panels installation.

1.2 Pile Extracting Function: With the same equipment and hydraulic system for extracting poorly driven or incorrectly positioned posts or road maintenance work, it is a professional machine for extracting the posts out of any conditions of ground.

2. Features

2.1 TDB230 Highway Guardrail Pile Driver and Extractor is composed of chassis, upper column, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system, control system, post driving and extracting equipment. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency and low price.

2.2 When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by hydraulic system, then put the switch of clutch with the traveling roller chain at the right position. The up and down, longitudinal and transverse shift, horizontal slide and rotation of the column are realized through hydraulic system.

2.3 The hydraulic hammer is installed onto the upper column and be downward and upward along the track of the column for pile driving and extracting working by hydraulic system. When extracting guard rail posts, the extractable supporting foot is hydraulically positioned on the ground, for enhanced stability and safe pile extraction.

2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.

2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.

2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.

2.7 The equipment does not need to turn the direction during driving and extracting the guardrail posts on both sides because of its 360° rotating device.

3. Main Technical Specifications

TypeTDB230
Rated Power24 HP
Power of battery for electric start500 W
Size (L×W×H)4290×2000×2620 mm
G.W.2800 KG
Weight of Hydraulic Hammer300 KG
Dia. Of Drill Shank70 mm
Hydraulic System Pressure16 MPa
Hydraulic System Flow50-55 L/min.
Displacement65 ml/r
Impulsive Pressure10-16 MPa
Impulsive Frequency10-15 Hz
Rotation Angle360°
Radius of Gyration2100 mm
Extracting Stroke1600 mm
Lateral Stroke350 mm
Lateral Distance860 mm
Supporting Foot Stroke400 mm
Pile Driving Force per Stroke of HammerAround 250 KN
Pile Extracting ForceAround 250 KN
Working height of hydraulic hammer≤3000 mm
Traveling Speed0-15 km/h
Tow SpeedAround 80 km/h

Highway Guard Rail Pile Driver Hammer
Packaging Detail:pile driver hammer:Export and Sea-worthy Standard Special Packing
Delivery Detail:Pile driver hammer: 10days after receiving advance payment

Related Product for Highway Guard Rail Pile Driver Hammer


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208