high efficiency industry boiler with Baltur gas burner
Place of Origin:Henan China (Mainland) | Brand Name:YUTONG | Model Number:WNS | Type:oil or gas |
Product name:high efficiency industry boiler with Baltur gas burner | Fuel:Gas/oil | capacity:1 to 20t/h | Rated steam pressure:0.7--1.6Mpa |
Rated steam temperature:saturated temp | Water supply temperature:20centigrade | Thermal efficiency:>90% | burner brand:baltur,optional |
size:as the details | weight:4---45t |
high efficiency industry boiler with Baltur gas burner
This series boiler is three-reture fire tube steam boiler .It equipped with a bias furnace tube structure ,and high temperature gas into the atmosphere through three-reture smoke chamber .It equipped with good performance burner and advanced techniques.The burning control ,water feed ,programs run ,etc,is full automatic .This fantasy boiler is safe and reliable ,and also has the advantage of compact structure ,simple operation ,easy installation ,high efficiency ,less pollution and noise ,etc.
Features:
1.The structure of boiler is compact and reasonable .This product is composed of three parts :boiler body ,chimneys and piping systems.And body and chimneys have been manufactured in the factory .Piping systems will be installed .When it was transported to the site ,we connect the gas source ,power and water line together .It can save a lot of time and guarantee the product quality.
2.The design performance of boiler is advanced .The boiler body is the overall structure .The burner was assembled in the first smoke cover .The body arranges heating surface and combustion chamber with a reasonale ,compact structure . so the structure has a low consumption in steel .Packaging shape is rectangular ,and makes the boiler performance ,weight ,stucture ,size ,appearance more advanced and beautiful than domestic products .The boiler feed water epuipment is integrated with the body ,so it do not need another foundation.
3.The water cycle is simple ,and water quality can be guaranteed .
4.The techniques are advanced .
Parameter of WNS Series steam boiler | ||||||||||||
Model | WNS1-0.7-Y(Q) | WNS1.5-1.0-Y(Q) | WNS2-1.0-Y(Q) | WNS3-1.0-Y(Q) | WNS4-1.0-Y(Q) | WNS5-1.0-Y(Q) | WNS6-1.25-Y(Q) | WN8-1.25-Y(Q) | WNS10-1.25-Y(Q) | WNS15-1.25-Y(Q) | WNS20-1.25-Y(Q) | |
WNS1-1.0-Y(Q) | WNS1.5-1.25-Y(Q) | WNS2-1.25-Y(Q) | WNS3-1.25-Y(Q) | WNS4-1.25-Y(Q) | WNS5-1.25Y(Q) | WNS6-1.6-Y(Q) | WNS8-1.6-Y(Q) | WNS10-1.6-Y(Q) | WNS15-1.6-Y(Q) | WNS20-1.6-Y(Q) | ||
Rated capacity(t/h) | 1 | 1.5 | 2 | 3 | 4 | 5 | 6 | 8 | 10 | 15 | 20 | |
Rated steam pressure(Mpa) | 0.7/1.0 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | |
Rated steam temperature(°C) | 170/184 | 184/194 | 184/194 | 184/194 | 184/194 | 184/194 | 194/204 | 194/204 | 194/204 | 194/204 | 194/204 | |
Water supply temperature(°C) | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | |
Heating area(m2) | 25 | 36 | 60 | 77 | 113 | 127 | 181 | 190 | 232 | 346 | 467 | |
Thermal efficiency(%) | >90 | >90 | >90.2 | >90.5 | >91 | >91.3 | >91.3 | >91.6 | >91.6 | >91.8 | >92 | |
Fuel available | Light oil,heavy oil,natural gas | |||||||||||
General power(KW) | 3.6 | 4.8 | 7 | 10 | 13 | 16 | 19 | 29 | 33 | 60 | 90 | |
Feed pump model | JGGC2-8×16 | JGGC2-8×16 | JGGC2.4-8×18 | JGGC4-8×18 | JGGC4.8-8×22 | JGGC6-8×18 | JGGC6-8×19 | JGGC9-15×10 | JGGC12.5-15×116 | JGGC16-15×12 | JGGC25-35×5 | |
Fuel consumption | Light oil(Kg/h) | 66.5 | 99 | 133 | 196 | 266 | 332 | 399 | 532 | 660 | 997 | 1204 |
Natural gas(Nm3/h) | 75 | 112 | 150 | 225 | 300 | 375 | 450 | 600 | 750 | 1125 | 1418 | |
Weight of biggest part for transportation(t) | 4 | 4.5 | 8 | 9 | 13 | 14.3 | 19 | 22.6 | 25.5 | 34 | 45 | |
Overall dimension of boiler assembled(m)(L×W×H) | 3.6×2.0×2.0 | 3.8×2.0×2.0 | 4.8×2.5×2.46 | 5.3×2.5×2.5 | 5.8×2.85×2.8 | 6.3×2.9×2.8 | 7.25×3.1×3.15 | 7.45×3.26×3.2 | 8.7×3.26×3.2 | 8.7×3.7×3.5 | 10×3.6×4.0 |
Clients visiting factory
Packaging Detail:standard packaging,boiler body nude packing,auxiliary equipments iron case or wooden case |
Delivery Detail:delivery time of boiler in 20days afte receive down payment |