double girder gantry rail mounted crane cabin control

rail mounted crane, 1.reliable,safety and durable performance, 2.the best pre-sales and after sale service, 3.ISO,BV,CE,TS - details see: https://www.machineto.com/double-girder-gantry-rail-mounted-crane-cabin-control-10099773
Feature:Gantry Crane,steel box typeCondition:NewApplication:sea port,workshop,yard,factoryRated Loading Capacity:5--300t
Rated Lifting Moment:300tMax. Lifting Load:300tMax. Lifting Height:6--30mSpan:10--50m
Place of Origin:Guangdong China (Mainland)Brand Name:GuanhuiModel Number:MGCertification:ISO,BV,TS
Warranty:1 yearAfter-sales Service Provided:Engineers available to service machinery overseascolor:yellow,red,orange,blue,variousindustry voltage:220V,380V,415V,440V,480V
control voltage:24V,36V,48Vfrequency:50/60HZproduct name:rail mounted crane cabin controlPhase protection:Include
Lifting limit switch:Include   
double girder gantry rail mounted crane cabin control
contact supplier for double girder gantry rail mounted crane cabin control


Rail mounted crane

specification:

Capacity(t)5t--10t16t---25t32t--50t75t--100t125t---300t
Span(m)

10m---50m

Lifting height(m)

6m---30m

Control mode

Pendant control,wireless remote control,cabin control

Lifting speed(m/min)

6,7,8,9,10,12

1,2.4,3,4,5,6

Travelling speed(m/min)

20,30,45,54,60,75(can add Inverter)

Service class(work grade)

A3,A4,A5,A6,A7

Cantalever

One side or two side cantilever

Supply power(three phase power)

380V 50HZ 3Phase (according to user require)

Working ambient temperature

-20°C~+45°C

Hoist type

Winch trolley or Hoist trolley ; single or double speed

Note

It’s not suitable for lifting blazing & melting metal or toxicant as well as explosion-proof or insulating working conditions.

Rail mounted crane

Product Features:

1) Reasonable structure
2) Favorable performance
3) Smooth starting and stopping
4) Safe and reliable traveling
5) Low noise, commodious cabin and good view
6) Convenient maintenance, excellent exchangeability for parts and components
7) Energy saving,reduce energy consumption
8) Using transducer for travelling or traversing crane to realize step speed or stepless speed change

9)Primer and finishing paint

10)Crane structure:steel box type

safety features:
1)Overloading protection
2)Top quality long time bearing polyurethane materials buffer
3)Crane traveling and cross limit switch
4)Voltage lower protection function,reduce energy consumption

5)Main lifting motor with thermal protection

6)Hooks with latch

7)Rubber buffers

8)Protective earthing

9)Sub-assembly characteristic are tested before assembly
10)Emergency stop system, current over-load protection system, Excellent exchangeability for parts and components

................................................................................................................................................................................................................

Rail mounted crane

Product Detail

Factory and Certificate

Rail mounted crane

Our Services

Services ItemServices Description

Installation and Commissioning Services

1.The seller will provide all English manual documents before shipment.
2.If the buyer requires, technician will be sent to the buyer’s site by the seller for installation and commissioning.
3. The warranty period of the machinery is one year. The seller is responsible for the maintenance if quality problem occurs.

Crane Maintenance: Improve your crane’s safety level and performance

To run a successful business requires high level of equipment reliability, productivity, and efficiency, which is exactly whatGuanhuicrane maintenance services deliver for customers.

1.Crane & Hoist Repairs:

Guanhuiprovides Crane & Hoist Repairs on All Makes and Models of Cranes and Hoists.

2.Crane Inspection:

We will analyze your cranes then make recommendations on how to make improvement for the machines. With regular standard inspections, we assure you fulfillment of statutory requirements and reduction of the risk of breakdowns.

3.Preventative Maintenance:

Weensure that your equipments are in peak operating condition by making a preventative maintenance.

4.Crane Modernization:

We upgrade your old Crane and Hoist to meet current production requirements by certain means. (different case different means)

5.Crane spare part: Responsive, reliable, and easy to deal with

Whenever you need spare parts for your equipments or customized manufacturing, your inquiries will be responded within 24 hours. (expedited delivery option is available)

WARRANTY POLICY:

We provide 12 months for warranty since the date of goods arrived at destination port.

-------------------------------------------------------------------------------------------------------------------

LEADING TIME:

50-80 working days after 30% deposit payment is received according to order quantity. Pls confirm with our sales in time before placing order. Thanks in advance.

-------------------------------------------------------------------------------------------------------------------

PAYMENT TERM:

30% should be paid as deposit against order confirmation; 70% should be paid as balance before delivery. All by T/T or L/C at sight .

-------------------------------------------------------------------------------------------------------------------

MY FRIENDS, YOU ARE WELCOME TO INQUIRE ON OUR RAIL MOUNTED CRANE PRODUCT AND PRICES, AND ANY INQUIRY SHOULD BE REPLIED WITHIN 24 HOURS.

double girder gantry rail mounted crane cabin control
Packaging Detail:wooden box and plastic paper
Delivery Detail:60 days

Related Product for double girder gantry rail mounted crane cabin control


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208