Cooling Fermentation Tank

cooling fermentation tank, 1.SUS304 or 316L,capacity:50L-10,000L, 2.60 degree conical bottom, 3.home brew or brewery, 4.CE - details see: https://www.machineto.com/cooling-fermentation-tank-10300535
Place of Origin:Zhejiang China (Mainland)Brand Name:HS(cooling fermentation tank)Model Number:HSMTStainless steel 304 or 316L:conical bottom
Cooling Fermentation Tank
contact supplier for Cooling Fermentation Tank


Item:cooling fermentation tank
Volume :50L-2000L or As customer's demands.
Material :High quality SUS 304 or 316L
Payment :T/T. L/C
Package :Wooden case or As customer's demands.
MOQ :1 PC
Port of shipmentNingbo or Shanghai available
Delivery time :Within 35~ 50days after down payment
Guarantee24 months against the date of B/L

Technical data:

specification(BBL)conical bottom angleinner diameter/overall height
1060100-2418/1000-2520
50601700-4855/1800-4620
10060/65/70/752100-6140/2300-5250/
2300-5060/2200-5540
12060/902100-7000/2200-6400/
2200-6600/2700-5400/
2100-6380

♥ Supply Double-layer, stainless steel tanks, with a wide capacity range from 500L to 50, 000L and even larger.

♥ This Double-layer wine tanks are widely applied in the beverageprocess industries used as buffer tank and storage tank, which cleanable to sanitary standards (e. G. FDA, USDA standards).

♥Configuration:
1) Manhole
2) CIP cleaner
3) Adjustable triangle bracket
4) Ladder
5) Thermometer
6) Liquid lever meter and controller
7) Dismountable Inlet assembly
8) Sanitary breathing cover

♣ Head and the inner tank weld detection

1.Air and water to the tank→2.Hold pressure for 12 hours → 3.Spray soapy water in the head and the inner tank of the weld

→4.If leakage, there will be a soap bubble on the head and the inner tank of the weld

♣ Conical bottom and inner tank weld detection

1.Cheer to the insulation layer → 2.Brush soapy water in the tank internal

→3.If leakage, there will be a soap bubble on the Conical bottom and the inner tank of the weld

Use attention security item

Intake should be slow to open the intake valve until the required pressure

After the stop use, pays attention to the clamp cover in puts the excess water

♥service:

1)we will supply you with drawing before manufacturing.

2)we will firmly manufacture according to the drawing.
3)we will be in charge of installation.
4)we will send you our fittings for free if it is broken bt accident during 2 years.

♣Star products♣

Cooling Fermentation Tank
Packaging Detail:standard export package!
Delivery Detail:40 days after confimation!

Related Product for Cooling Fermentation Tank