25-75 m3/h concrete station
| Condition:New | Power Type:Electric | Place of Origin:Shandong China (Mainland) | Brand Name:shandong lianchuang |
| Model Number:hzs75 | Power(W):85 | Weight:35000 | After-sales Service Provided:Overseas service center available |
| Max.productivity:75m³/h | Mixer:js1500 | Stroage bucket capacity:3x8m³ | Discharge height:1.7-3.8m |
| charge height:2.9m | Total power:110kw | Total weight:35000kg | Working Cycle Period:75s |
| Charging Capacity:2400L | External dimension (L*W*H):According to the model of disposition and layout |

HLS Series
Ready-Mixed Concrete Batching Plant
1.What are the merits of your product?
Excellent performance
High reliability
Accurate weighing
Excellent maintenance
2. What products can do ?
It can use many manners ofcombining and chargingaccording to customers’ needs. It can producedry-rigid,half dry-rigid ,plastic ,and every distribution ratio concreteand use the mixing technology of wrapping-stone mode which can improve the quality of concrete greatly.
3.Do you have other model?
Now we haveHZS25,HZS40,HZS5000,HZS75,HLS60,HLS90,HLS120,HLS180andany othertypes available.
| Model | HZS25 | HZS40 | HZS50 | HZS75 |
| Max theory productivity(m3/h) | 25 | 35 | 50 | 75 |
| Mixer | JS500 | JS750 | JS1000 | JS1500 |
| Storage bucket capacity(m3) | 3×3 | 3×4 | 3×7 | 3×8(12) |
| Maximum size of aggregate(mm) | 60/80 | 60/80 | 60/80 | 60/80 |
| Discharge height(m) | 1.6-3.8 | 1.6-3.8 | 1.6-3.8 | 1.6-3.8 |
| Charge height(m) | 2.7 | 2.7 | 2.9 | 2.9 |
| Aggregate measuring accuracy(%) | ±2 | ±2 | ±2 | ±2 |
| Cement measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
| Fly ash measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
| water measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
| additive measuring accuracy(%) | ±1 | ±1 | ±1 | ±1 |
| Power(kw) | 35 | 50 | 60 | 85 |
| Total weight(kg) | 14000 | 18000 | 25000 | 35000 |
4.Can we trust your product quality ??
Yes,you can!!
our company isISO9001 quality certificationthrough the earlier of one of construction machinery, And the adoptionofenvironmental certificationin 2007.
5.After-sales and Packaging team.
1.Spare parts will be delivered as you need.
2.Engineers will go to clients’ site for guiding the installation and test-running;
3.Warranty period: 12 months since the installation and commisioning;
4.Service team will follow every placed order regularly till warranty period finished
6.Detailed picture
Concrete mixer
The screw conveyor
Computer control system
Batching machine
Sheet cement silo
7.Customer visiting

| Packaging Detail:Standard Exporting package |
| Delivery Detail:15-20 days after advanced payment |

