2013New!Dairy/Milk production line

1.2013New!Dairy/Milk production line, 2.Condition:New, 3.Application:milk and dairy, 4.material:304/316SUS - details see: https://www.machineto.com/2013new-dairy-milk-production-line-10033489
Condition:NewPlace of Origin:Jiangsu China (Mainland)Brand Name:NCModel Number:NC18-18-24-6
Type:Filling Machine,Filling machineVoltage:380VPower(W):9KWWeight:8000KG
Dimension(L*W*H):5900*2500*2800mmCertification:CE,SGS.TUV,CE,SGS,TUVWarranty:1YearAfter-sales Service Provided:Engineers available to service machinery overseas
Name:2013New!Dairy/Milk production lineAutomatic grade:AutomaticCapacity:6000-8000bphControl:PLC
Material:304/316SUSBottle size:22-2500mlPacking material:WoodenApplication:milk and dairy
2013New!Dairy/Milk production line
contact supplier for 2013New!Dairy/Milk production line


2013New!Dairy/Milk production line

Picture:

Fature:

Turnkey pasteurized milk production line/UHT milk processing line/milk drink processing machines.

The whole milk production line consists of the following systems:
1. Water treatment system
2. Suger melt system
3. Sterilizer system
4. Filling and packing system
5. CIP cleaning system
6. After treatment equipments, like conveyor, package or pallet, etc.
7. There are other assistant equipments used such as steam boilers, air compressor, cold water unit, etc.
8. Installation materials for the process pipline, utility pipeline as well as electrical installation are provided.
Filling and packing types can be decided by the customer then designed accordingly.
Our company can design customized milk production lines in accordance to the customers' requirements. The production capacity varies from 1000L/h to 10000L/h according to customer's need

Note: Jimei milk production lines can be widely used to produce UHT milk, pasteurized milk, setted milk, stirred milk, milk drink, yogurt, ice cream, condensed milk and milk powder, and so on.

Packling:

Factory:

If you have any question about this machine,please let me know,sincere service for you and welcome to Nancheng.

2013New!Dairy/Milk production line
Packaging Detail:Wooden case for dairy production line
Delivery Detail:30-45working days for dairy production line

Related Product for 2013New!Dairy/Milk production line


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208