ZYC Series Hydraulic pile drivers / what is pile driving
Price on request
Pricing is provided on request — use the quote form below.
- Port
- Shenzheng port
- Minimum Order Quantity
- 1 Set/Sets
- Supply Ability
- 300 Set/Sets per Year
- Payment Terms
- L/C,T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
Features:·no noise, No pullution·High pilling efficiency
| Condition | New | Place of Origin | Henan China (Mainland) |
|---|---|---|---|
| Model Number | ZYC420 | Dimension(L*W*H) | 13*7.2*3.05 |
| After-sales Service Provided | Engineers available to service machinery overseas | color | yellow |
| Details | · no noise, No pullution · High pilling efficiency |
| Packaging Detail | main machine nude packed but key parts packed by plastic paper & tape and sealed with grease. |
|---|---|
| Delivery Detail | 20-25 days after the recipt of the deposit |
Hydraulic Static Pile Driver-ZYC Series
Specialty equipment which installs piles using hydraulic cylinders to press piles into the ground.
Features:
u Excellent piling quality
u 14 patents in technology
u Customer's Design and Logo are Welcome ,ODM Accepted,OEM Accepted
Applications:
u Clay, soft soil, sand layer, etc.
u Noise regulated urban area.
u Vibration regulated areas
The pile driver is composed of clamping box, pile pressing mechanism, rise mechanism, travel mechanism, crane,hydraulic system, electric system and so on. It can finish all the pile lifting, pile pressing (including press side and corner pile), travel, and steering.
Patent technology:Patent No.ZL01249443.7
inverted cylinder avoids radial force and breakage of the cylinder.
Patent No. ZL02139875.5
Hydraulic Static Pile Drivers with embracing and top-pressing at the same time.
Ethiopia A.M.B Construction/civil building piling
Egypt A.D.C Foundation Group/ city square construction
Philippines Mega Foundation International corp
Promise Service: Currently we have the agency in South Asia,Myanmar,Vietnam,Thailand,which can offer the installation and maintenance immediately on site and 24
hours at most for other countries.
the test of side piling in Philippines
hanging the sqaure pile by crane for the central piling test in the Philippines
The machine moving faster than other brand
The main body installation
piling test
piling test
Steel Guardrail Post Hydraulic Pile Driving Equipment
Static Piling Machine ZYC400B-B
Post Driver for Solar Installation
Precast Hydrostatic Concrete Pile Driver/Pile Machine
Hydraulic Driller for Guardrail Post
Vibratory Hammer DZJ-90, vibratory pile hammer, used vibro hammer