waste tyre and plastic pyrolysis machine

Model GM-5100,GM-6000,GM-2600*6000,GM-2800*6 Machinery Processing Services Henan,China(Mainland) Ref 10368370

Price on request

Pricing is provided on request — use the quote form below.

Port
lianyungang
Minimum Order Quantity
1 Set/Sets
Supply Ability
30 Set/Sets per Month
Payment Terms
T/T

Request a Quote

Product: waste tyre and plastic pyrolysis machine

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

GM series waste tyre,plastic,rubber pyrolysis machine,carbon black refining machine,distillation machine for diesel and gasoline

Specifications

Place of Origin Henan China (Mainland) Model Number GM-5100,GM-6000,GM-2600*6000,GM-2800*6000
Details GM series waste tyre,plastic,rubber pyrolysis machine,carbon black refining machine,distillation machine for diesel and gasoline

Packaging & delivery

Packaging Detailone whole set in two containers
Delivery Detail15 to 25 days

Product description

Dear Mr.

Thanks for your E-mail and attention to our machine.

We mainly manufacture tires pyrolysis machine which extracting oil, carbon black from waste tires, rubber and plastic. We mainly have four models.

(1) GM-5100, the reactor 2200mm diameter*5100 length, can process 4 tons per batch, three batches in two days, in average it process 6 tons per day;

GM-6000, the reactor 2200mm diameter*6000 length, can process 5 tons per batch, three batches in two days, in average it process 7-8 tons per day.

----The above two small models need two 40HC for shipping .

The whole set machine itself needs about 250 square meters land, costs about 60kg coal per ton tires, 10kw electricity per hour.

(2) GM-2600-6000, 2600mm diameter*6000mm length, can process 8 tons per batch, one batch per day;

GM-2800-6000, 2800mm diameter*6000mm length, can process 10 tons per batch, one batch per day.

----These two large models need one 40FF and one 40HC container to ship.

(3) Our delivery time is 15days to 25days. If the order comes earlier, we can finish the machine in 15days.

We trust that this offer meets your requirement and look forward to hearing from you .

Add:

Responsible for equipment manufacturing, our work and guide installation and debugging

Second, equipment installation ends, we entrust technical personnel and assist the buyer's guide, and the staff of the production of technical training for staff, so as to facilitate the buyer to staff production skills.

Third, equipment (including accessories) (human factors and wear parts, except one year guarantee) all non-standard parts according to gb, if we provide equipment instructions and normal production and operation process, we should be unconditional to damage the deployment.

Fourth, we provide free catalyst formula for the buyer.

FAQ

What model is this machine?
The model number is GM-5100,GM-6000,GM-2600*6000,GM-2800*6.

Related products in Machinery Processing Services