Towable sprinkler irrigation machine for agriculture machinery
Sprinkler irrigation machine advantages:, 1.Higher efficiency to manage., 2.Less labor., 3.Very flexible. - details see: https://www.machineto.com/towable-sprinkler-irrigation-machine-for-agriculture-machinery-10182826
| Type:Irrigation System,lateral move irrigation system | Usage:Agriculture | Condition:New | Place of Origin:Liaoning China (Mainland) |
| Brand Name:huaxingyulin | Model Number:DPP-327 | Material:Other | color:silvery |
| Use:irrigation | Certification:ISO9001:2008 |

Sprinkler irrigation machine allocation standard:
| Main pipe diameter of sprinkler irrigation machine | 6-5/8 (168mm*3.2mm,high frequency welded steel pipe) |
| Standard span of sprinkler irrigation machine | 6-5/8"(168mm)*54.5m(8 pipes) |
| King-sized span | 6-5/8"(168mm)*61.3m(9 pipes) |
| Cantilever pipe | 5-9/16″(141mm) |
| King-sized cantilever pipe | 4″(101mm) |
| Pipe length | 22 feet/one, (6.7m) |
| Sprayer of sprinkler irrigation machine | USA Nelson D3000/R3000 |
| Power supply mode | diesel generator and the local power company provide |
| Main pipe Flange | Thickness:10mm(double welded technology.) |
| Working voltage | 460--380V/50--60HZ |
| Tire type of sprinkler irrigation machine | 14.9 * 24 vacuum irrigation tire |
| Span body tower structure | adopt “V” model tower |
| Main cable | 4*4mm²+6*1.5mm²(resisting ultra violet and aging) |
| Motor speed reducer | electric transmission gear box (American UMC) |
| The end | LED working status instruction light |
| Motor power of sprinkler irrigation machine | 0.75~1.5 horse power |
| Motor speed reducer | output speed of electric transmission gear box :28--86RPM |
| Sprayer spacing | 2.2-4m(the quantity:2-3 sprayer/water pipe |
| Irrigation intake | 1 water inlet in center point, quick pipe joint connected structure |
| Irrigation intake caliber | 8 inches, the spot water supply pipe is more than 6 inches. |
| Irrigation intake pressure | 0.20—0.35mpa |
| Standard irrigation truss height from the ground | 3.2m |
After complete machine steel components are welded, it adopts hot galvanizing.

| Packaging Detail:standard package |
| Delivery Detail:within 28 days after receipt of the down payment |

