Steel Decking Roll Forming Machine
Steel Decking Roll Forming Machine, Machine with CE certificate - details see: https://www.machineto.com/steel-decking-roll-forming-machine-10169573
| Condition:New | Type:Cold Rolling Mill | Place of Origin:Zhejiang China (Mainland) | Brand Name:zhongyuan |
| Model Number:zyyx | Voltage:380v/50hz/3phase | Power(W):22kw | Dimension(L*W*H):16tons |
| Weight:15m x 1.8m x 1.6m | Certification:BV & SGS | Warranty:1 year (excluding wearing parts) | After-sales Service Provided:Engineers available to service machinery overseas |
| color:blue(depend on customer) | Roller Material:High grade No.45 forged steel | Shaft Material:High grade No.45 carbon wrought steel | Cutter blade:Cr12 mould steel with quenched treatment |
| Electric Elements:Mitsubishu PLC and Transducer |

Steel Decking Roll Forming Machine
1.Technical parameter:
Item | Specification | |
Material | Type | galvanized coils |
| Thickness(mm) | 0.8-1.2mm | |
| Yield strength(mpa) | 235 | |
Roller material | 45#Chrome steel | |
Forming speed(m/min) | 15-20 | |
Output speed(m/min) | 8 | |
Speed adjusting mode | AC Frequency | |
Roller drive | Decelerating motor + Chain drive | |
Cutting mode | Hydraulic cutting | |
Cutter material | Cr12 mould steel | |
Length measurement | Encoder | |
Control mode | Mitsubishi PLC | |
Operating mode | Button + Mitsubishi Touch screen | |
Main motor power(kw) | 11KW x 2 | |
Hydraulic station motor power(kw) | 5.5 KW | |
2. Components of machine:
| Decoiler | 1set |
| Feeding & guiding device | 1set |
| Main roll forming machine | 1set |
| Hydraulic cutting system | 1set |
| Controlling system | 1set |
| Run out table | 1set |
3.Process flow:
Decoiler -- Feeding & Guiding -- Roll forming---Hydraulic Cutting–product to run out table

| Packaging Detail:1. One 40ft container and one 20ft container for one machine with mechanical decoiler; 2. Main machine body and decoiler is load naked (tighten to container with steel wire rope);3. PLC cabinet be packaged by protective film;4. Some spare parts and tools are loading in tooling box. |
| Delivery Detail:60 days after receipt of advanced payment |

