Stainless Steel Cylinder Piston Details:
1). Piston parts are used in hydraulic cylinder, farm machinery etc.
2). All seals are manufactured to US specification.
3). Piston Finish: Fe/Zn Bright chromating min 25μ ,Thermal treated, rust prevents, ting oil, hot galvanization, cold galvanization, powder Coating and so on.
4). Material Available: Ductile iron QT450, ASTM A536 65-45.12, ASTM 8620, ASTM 8630, ASTM A148 grade 90-60, ASTM A216 70-36 grade WCB, C1018, C1020, C1045, 304 SST, Z2CN18.10, X20Cr13, 9SMnPb28k, 11SMnPb30, X2CrNi18-9, aluminium6061-T6, 6463-T6, 7075-T6 and so on
5). Quality Approvals: all pistons are subjected to 3 phases of through inspection using qualified instrument before dispatching.
Piston Parameters:
Our Pistons are used in hydraulic cylinder,automobiles, industries, mining, agriculture, marine etc.
| Reference | A | B | C | D | E | Weight(kg) |
| P4020CI | 40 | 20 | 31 | M16×2 | 41 | 0.21 |
| P5020CI | 50 | 20 | 33 | M16×2 | 44 | 0.41 |
| P5025CI | 50 | 25 | 33 | M22×2 | 44 | 0.37 |
| P6020CI | 60 | 20 | 33 | M16×2 | 44 | 0.56 |
| P6025CI | 60 | 25 | 33 | M22×2 | 44 | 0.52 |
| P6325CI | 63 | 25 | 33 | M22×2 | 44 | 0.64 |
| P7030CI | 70 | 30 | 35 | M27×2 | 46 | 0.77 |
| P8030CI | 80 | 30 | 42 | M27×2 | 53 | 1.3 |
| P9030CI | 90 | 30 | 45 | M27×2 | 56 | 1.89 |
| P9040CI | 90 | 40 | 45 | M36×2 | 56 | 1.79 |
| P10040CI | 100 | 40 | 45 | M36×2 | 57 | 2.1 |
Process Flow Chart:
We are:
2. Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc.
3. Quality Certificates: ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL.
4. Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc.
5. Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching.
6. MOQ: 10pcs. Production capacity: 100000pcs/month
7. The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable
8. Delivery Time: about 20 days by the sea transportation.
9. The sea port of the shipment: Beilun Ningbo Zhejiang province