SC200 Load 2t Construction lift
1.The SC200 have one cage;, 2.Load 2t (19 person), 3.Double 15Kw Motor, 4.Operation speed 33m/min. - details see: https://www.machineto.com/sc200-load-2t-construction-lift-10098006
| Condition:New | Place of Origin:Chongqing China (Mainland) | Brand Name:Ji Da Pai | Model Number:SC200 |
| Rated Loading Capacity(kg):2000KG(19 person) | Hoisting Speed:33m/min | Max Lifting Height:300m | Counter-weight:no |
| Amount of cage:1 | Rated load per cage:2000kg(19 person) | Color of cage:Yellow or Red | Size of cage:3*1.3*2.5m |
| Size of standard section:0.71*0.71*1.508 | Color of standard section:Black or Red | Amount of motor:2 | Electrical power:15kw |
| Power source:Electric |

SC200 Construction Main Technical Parameter
| No. | Items | Parameter |
| 1 | Model | SC200 |
| 2 | Work way | Transmission by gear and rack |
| 3 | Counter-Weight | NO |
| 4 | Amount of cage | 1 (have Cab) |
| 5 | Rated load | 2000kg (19person) |
| 6 | Operation speed | 33.0m/min |
| 7 | Size of Cage External(L×W×H) | 3.12×2.192×2.57m(have Cab) |
| 8 | Size of Cage Internal(L×W×H) | 3×1.3×2.25m(no Cab) |
| 9 | Size of standard section | 0.71×0.71×1.508m |
| 10 | Safety-brake load | ≥40KN |
| 11 | Overload protection device | have |
| 12 | Electrical power(Continuous work) | 15Kw |
| 13 | Cable | 1 |
| 14 | Amount of motor | 2 |
| 15 | Distance between two attchment | ≤6m |
| 16 | Weight of cage | 1800kg |
| 17 | Weight of standard section | 170kg |
| 18 | Package | Bare&Band |
The standard section

| Packaging Detail:Bare or Bank in Iron |
| Delivery Detail:Contract Take force 30days first batch product bagin off-shore |

