prefab house c purlin roll forming machine,c section purlin forming machine,pre-engineering house purlin making machine
1:C&Z Purlin, 2:High speed, 3:Mitsubishi PLC, 4:Long service life, 5:Multiple groups of sizes by adjusting the spacer - details see: https://www.machineto.com/prefab-house-c-purlin-roll-forming-machine-c-section-purlin-forming-machine-pre-engineering-house-purlin-making-machine-10088025
| Type:Steel Frame & Purlin Machine | Condition:New | Production Capacity:15m/min | Place of Origin:Zhejiang China (Mainland) |
| Brand Name:SMT | Model Number:LCA300 | Voltage:380V/415V/220V | Warranty:1year after shipping |
| After-sales Service Provided:Engineers available to service machinery overseas |

The purlin roll forming line includes in: decoiler , leveling equipment, roll forming system, punching equipment ,cutting equipment, hydraulic station, electric controlling system and supporter for purlin.
We can also customize the machine according to your requirement.
Technical Parameters
| No | Item | Parameter | Remark | |
1 | Suitable Material | Type | Galvanized Steel | |
| Thickness(mm) | 2.0-3.0 | According to customer's requirement | ||
| Yield Strength(Mpa) | 230-300 | |||
| 2 | Forming Speed(m/min) | 10 | not including the punching and cutting | |
| 3 | Material of Punching Die | bearing steel | with quench treatment | |
| 4 | Cutting Mode | hydraulic cutting | According to customer's requirement | |
| 5 | Power source | Type | 380V/3PH/50HZ | According to customer's requirement |
Components of the machine
| No | Name | Quantity | Remarks | |
| 1 | Decoiler | 1set | Up to customer | |
2 | Main Machine | Leveling Device | 1set | |
| Punching Device | 1set | |||
| Pre-cutting Device | 1set | Up to customer | ||
| Roll Forming | 1set | |||
| Hydraulic System | 1set | |||
| 3 | Electric Control System | 1set | ||
| 4 | Supporter | 2pcs | Up to customer | |
Photos:
Punching & Cutting System:
Roll Forming System:
Output C Purlin:

| Packaging Detail:The main machine is nude loaded in the container, the electric controlling box is packed by protect film and all the spare parts are put in the wooden box. |
| Delivery Detail:60 days after receiving the down payment |

