NINGGUANG NGT001 chair mould
Price on request
Pricing is provided on request — use the quote form below.
- Port
- SHANGHAI OR NINGBO
- Minimum Order Quantity
- 1 Set/Sets 1
- Supply Ability
- 20 Set/Sets per Month 1
- Payment Terms
- L/C,T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
Charis & Plastic Drawer mould·Collapsible chair mould and regular chair with arm or without arm
| Place of Origin | Zhejiang China (Mainland) | Model Number | NGT001 |
|---|---|---|---|
| Details | Charis & Plastic Drawer mould · Collapsible chair mould and regular chair with arm or without arm |
| Packaging Detail | Wooden crate |
|---|---|
| Delivery Detail | depend |
| Name | Plastic Mould |
| Mould material | 45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61 etc. |
| Mould base | 45C,50C |
| Cavity | Single/multi |
| Runner | Hot/cold |
| Design software | UG, PROE, CAD, CAXA |
| Plastic material | PP, PC, PS, PE, PU, PVC, ABS, PMMA |
| Mould life | 300,000-3,000,000 shots |
| Delivery time | 15-60days |
| Specification | Depends on customer's requirements. |
| Mould running | Full automaticity |
| Injection Cycle Time | 30-60 seconds |
| T1 time | 30-60 days |
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
BUSINESS STEP
| 1.R&D | We support customer R&D. Make the files or improve the design if you needed |
↓↓↓ | |
| 2.Quotation Making | Mould Quotation will be finished in 1 day according to information we get |
↓↓↓ | |
| 3.Negotiation | The quality ,price ,material,delivery time .payment item.ect |
↓↓↓ | |
| 4.Mould Design | 3-5 days for mould and product 3D/2D drawing design |
↓↓↓ | |
| 5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 30-60 days |
↓↓↓ | |
| 6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. |
↓↓↓ | |
| 7.Sampleshoot | |
↓↓↓ | |
| 8.Delivery | Delivery goods by sea or by air ,according customers requirement |
Fertilizer Pellet Making Machine/ fertilizer making machine/Large capacity fertilizer pellet making line
Gold Mining Equipment, Gold Flotation Machine
3 tubes Cigarette Roller
Lastest and fastest ZW grass cutting lawn moving machine
Top-level charcoal powder briquetting machine equipment
CE Standard PU Type Structural Insulated Panels Machine