Metals and tools gold PVD vacuum plating machine

1.2000*2200mm vacuum chamber size, 2.hadware surface treatment, 3.vacuum coating line, 4.the size and color can be customized - details see: https://www.machineto.com/metals-and-tools-gold-pvd-vacuum-plating-machine-10365575
Place of Origin:Shandong China (Mainland)Brand Name:LKBTModel Number:DCLDcolor:RED
Metals and tools gold PVD vacuum plating machine
contact supplier for Metals and tools gold PVD vacuum plating machine


Description

Ion coating gold equipment main model and parameters
parameters type700 type800 type900 type1000 type
dimension of vacuum chamber700×1000800×1000900×10001000×1000
pumping speed1×105Pa~3×10-3Pa≤20min
limit vacuum≤1×10-3Pa
system form a complete setKT-400/2X-70
2X-15
KT-500/2X-70
2X-15
KT-500/2X-70
2X-15
KT-600/2X-70
2X-15/ZLD-600
workpiece systemRotation of the planet forms(8 roating shaft, since the amount)
heating methodsEdge installation of stainless steel heating tube
ion bombardmentdirect current 1000V or contravariant impulse 1000V high voltage bombardment
vent systemMass flow controller control input gas
arc target amount4468
magnetron target amountone plane targetone plane targetone plane targetone plane target
working methodsplc semi-auto control or pc+plc auto control
working gasAr N2O2
total power30KW35KW45KW50KW
compress air0.4~0.8MPa
water-cooling systemhydraulic pressure/water temperature:≤25°C/≥0.25MPa(user provide for himself)

Ion coating gold equipment main model and parameters
parameters type700 type800 type900 type1000 type
dimension of vacuum chamber700×1000800×1000900×10001000×1000
pumping speed1×105Pa~3×10-3Pa≤20min
limit vacuum≤1×10-3Pa
system form a complete setKT-400/2X-70
2X-15
KT-500/2X-70
2X-15
KT-500/2X-70
2X-15
KT-600/2X-70
2X-15/ZLD-600
workpiece systemRotation of the planet forms(8 roating shaft, since the amount)
heating methodsEdge installation of stainless steel heating tube
ion bombardmentdirect current 1000V or contravariant impulse 1000V high voltage bombardment
vent systemMass flow controller control input gas
arc target amount4468
magnetron target amountone plane targetone plane targetone plane targetone plane target
working methodsplc semi-auto control or pc+plc auto control
working gasAr N2O2
total power30KW35KW45KW50KW
compress air
water-cooling systemhydraulic pressure/water temperature:≤25°C/≥0.25MPa(user provide for himself)
Metals and tools gold PVD vacuum plating machine
Packaging Detail:nuded cargo
Delivery Detail:60 days after receiving the downpayment

Related Product for Metals and tools gold PVD vacuum plating machine


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208