Load 1t or 2t Construction building lifter
1. SC100,SC200,SC100/100,SC200/200 four series., 2.1 cage or 2 cages., 3.Operation speed is 33m./min., 4. 2 motor per cage. - details see: https://www.machineto.com/load-1t-or-2t-construction-building-lifter-10098016
| Condition:New | Place of Origin:Chongqing China (Mainland) | Brand Name:Jida Pai | Model Number:Construction hoist |
| Rated Loading Capacity(kg):1000kg or 2000kg | Hoisting Speed:33m/min | Max Lifting Height:300 | Counter-weight:No |
| Amount of cage:1 or 2 | Color of cage:Red or Yellow | Operation speed:33m/min | Maximun installation height:300m |
| Rated load per cage:1000kg or 2000kg | Amount of motor:2 | Size of cage:3*1.3*2.5m | Size of standard section:0.71*0.71*1.508m |
| Power source:Electrical |

1.A series --Attaches to wall indirectly Construction hoist main Technical Parameter
No. | Items | Unit | Model | ||||
| SC100 | SC100/100 | SC200 | SC200/200 | ||||
| 1 | Work way | Transmission by gear and rack | |||||
| 2 | Counter-Weight | No | |||||
| 3 | Amount of cage | 1 | 2 | 1 | 2 | ||
| 4 | Rated load | Kg | 1000 | 2000 | |||
| 5 | Operation speed | m/min | 33.0 | ||||
| 6 | Size of Cage External (L×W×H) | m | 3.12×2.192×2.57(have Cab) | ||||
| 7 | Size of Cage Internal (L×W×H) | m | 3×1.3×2.25(no Cab) | ||||
| 8 | Size of standard section | m | 0.71×0.71×1.508 | ||||
| 9 | Safety-brake load | KN | ≥30 | ≥40 | |||
| 10 | Overload protection device | Have | |||||
| 11 | Electricalpower | KW | 11 | 15 | |||
| 12 | Cable | 2 | |||||
| 13 | Amount of motor | 2 | |||||
| 14 | Distance between two attchment | m | ≤9 | ||||
| 15 | Weight of cage | Kg | 1600 | 1800 | |||
| 16 | Weight of standard section | Kg | 170 | ||||
| 17 | Package | Bare&Band | |||||
2.A series construction lift attaches to wall indirectly.It applies to the building that characterized by complex complex frame and appearance.
.Wall Tie

| Packaging Detail:Nude or Band & Iron boxes in Container |
| Delivery Detail:Contract take force 30 days later ship the first batch product |