light keel steel roll forming machine
1.Roll speed:8-12m/min, 2.Frame:300H steel welding, 3.Diameter of main axis:80mm, 4.Thickness of steel belt:2-3mm, 5.Automatic - details see: https://www.machineto.com/light-keel-steel-roll-forming-machine-10079651
| Place of Origin:Shandong China (Mainland) | Brand Name:HIGH | Model Number:HFKJ-YC | After-sales Service Provided:Engineers available to service machinery overseas |
| color:bule | warranty:12months | certificate:ISO9001 |

C purlin roll forming machine, C profiles roll formingmachine, C shaped steel roll formingmachine
Roll speed:8-12m/min Frame:300H steel welding
Diameter of main axis:80mm
Thickness of steel belt:2-3mm
Automatic equipment with PLC control system
Process Flow:
decoiling--active feeding--roll forming--measuring length--cutting to length--product to stand
Main Equipment:
decoiler, main forming machine, hydraulic cutting, product stand, hydraulic system, electric system.
Technical parameter
| Suitable material | Color steel sheet , galvanized steel sheet, |
| Main motor power | 11KW with Cycloidal reducer |
| Hydraulic station power | 15KW |
| Hydraulic oil | 36# |
| Thickness of material | 2-3mm |
| Diameter of principal axis | Φ80mm |
| Material expand width | 150mm-420mm |
| Electric tension | 380V 3phase 50HZ or as the customer's requirements |
| Material of roller | CGr15 bearing steel HR58-60 |
| Rolling galvanization thickness | 0.05mm |
| Processing speed | 15m/min |
| Processing precision within | 1.00mm |
| Material of cutting blade | Cr12 mould steel with quenched treatment |
| Kind of drive | 0.6 inch chain link bearing model 6210 |
| Roller station | 13 Rollers |
| Dimension | 10.5m*1.7m*1.4m |
| Weight | 6.7Ton |
| Screen | 5.7 inch Taida screen |
| PLC brand | Taida DVP14ES |
Hydraulic decoiler
| Material coiler inner diameter | 450mm-700mm |
| Max coiler width | 600mm |
| Carrying capacity | 1500kg |
| Hydraulic power | 1.5kw |
| Pump inner diameter | 120mm |
| Working pressure | 12Mpa |

| Packaging Detail:nude packing |
| Delivery Detail:25 days |

