JNRY oil fired furnace of the most adavnced technology
Price on request
Pricing is provided on request — use the quote form below.
- Port
- Shanghai Port
- Minimum Order Quantity
- 1 Set/Sets
- Supply Ability
- 200 Set/Sets per Year
- Payment Terms
- L/C,T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
1.simple structure, small volume·2.refractory inside, flexible installation·3.short term of construction·4.most energy saving
| Place of Origin | Hubei China (Mainland) | Model Number | JNRY |
|---|---|---|---|
| Condition | New | After-sales Service Provided | Engineers available to service machinery overseas |
| Hot Air Furnace | Oil Furnace | Details | 1.simple structure, small volume · 2.refractory inside, flexible installation · 3.short term of construction · 4.most energy saving |
| Packaging Detail | Discussion |
|---|---|
| Delivery Detail | 30 days to 180 days |
Preheating type cyclonic oil furnace introduction
Its technical characteristics are as follows:
Parameters List
| Type | Capacity (KJ/h) | Furnace temp. (°C) | Heating efficiency (%) | Air temp. (°C) |
| JNRY-1 | 1×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-2 | 2×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-3 | 3×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-4 | 4×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-5 | 5×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-6 | 6×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-8 | 8×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-10 | 10×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-12 | 12×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-14 | 14×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-16 | 16×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-18 | 18×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-20 | 20×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-22 | 22×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-24 | 24×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-26 | 26×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-28 | 28×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-30 | 30×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-36 | 36×106×4.18 | 1000 | ≥97 | 250~850 |
| JNRY-55 | 55×106×4.18 | 1000 | ≥97 | 250~850 |
Notice: According to different materials, different capacity, the type is depended on designed data. The list is only for your reference.
Operating principle
Gearing oil pump in oil supply system conveys oil to burner, mixes with preheated air produced by blower completely. Then they will be conveyed to furnace hearth and product steady hot gas of about 1000°C, after air distributed to required temperature, at last to furnace outlet. The gas relief valve will blow off all residual after-heat when furnace stopping. The repeated explosion valve can eliminate explosion and shut off rapidly for preventing air input to burn out the bag.
Blower takes preheated high pressure air to furnace pass by burning nozzle and air-distributing entrances, then mixes with oil spray and burns out completely. Air after warming up enters to hearth can support combustion more steady, also can recover the heat energy and omit invest of heat preservation, that answers multiple purposes.
Adjusts elec. Air-adding valve at outlet of furnace to take atmosphere to furnace evenly and mixes with burn-out high temperature gas to produce required temperature gas.
More details please consult Thanks for your visting!
fuel dispenser pump/ATEX oil dispenser
anti automatic plastic processing equipment with
ZZZZ-50 Semi-automatic Needle assembly machine
Glove Knitting Machine JS204-10G
Diamond Wire Guide For EDM Wire Cut Charmilles
Upsetting Machine Used For Drill Pipe & Sucker Rod Upsetting (YW55 500/630/1250 ton)