JD-Automatic common iron nail machine

Metal Forging Machinery Hebei,China(Mainland) Ref 10165534

Price on request

Pricing is provided on request — use the quote form below.

Port
Xingang, China
Minimum Order Quantity
1 Set/Sets
Supply Ability
20 Set/Sets per Month
Payment Terms
L/C,D/A,D/P,T/T,MoneyGram,50% T/T in advance and the rest T/T against the copy of B/L

Request a Quote

Product: JD-Automatic common iron nail machine

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

JD-Automatic common iron nail machine·Professinal seller·Factory export·Technical guidance·Suppling accessorie

Specifications

Place of Origin Hebei China (Mainland) Product name JD-Automatic common iron nail machine
Nail length 30-70mm Certificate ISO9001:2008
Advantages Low noise, competitive price, environmental protection Quality Used life 20-30years
Consumption Save 20% power consumption Export country Russia,Thailand, India
Experience More than 13 years Business type Industry and trade integration
After-sale service One year warranty life-long maintenance Details JD-Automatic common iron nail machine · Professinal seller · Factory export · Technical guidance · Suppling accessorie

Packaging & delivery

Packaging DetailExport packing the end of the sleepers fixed machinery to do non-slip, with bubble wrap anti-collision,external plastic packaging waterproof moisture
Delivery Detail40 days after receive your advance payment

Product description

JD-Automatic common iron nail machine

1.Making nail length:30-70mm.
2.Low consumption and high output.
3.High quality and low price

Feature:

1.Factory export.

2.High quality and competitive price.

3.We can design the machine that meet your requirements.

4.Excellent after-sale service.

Main technical parameter:

Technical

parameter

Max diameter of nail(mm)Min diameter of nail(mm)Max length of

Nail(mm)

Min length of nailMain power

(KW)

3A3.11.870303

We can produce all kinds of machines meeting customers' requirement.

Moreover,we would like to give customers our advice on past experiences for producing much better and avoiding some unnecessary troubles.

Trade Information

1.Payment:50% T/T in advance and the rest T/T against the Copy of B/L.

2.Delivery Time:Within 40 Days after receive you prepayment.

FAQ

What certifications does it have?
Certification: ISO9001:2008.

Related products in Metal Forging Machinery