Hydraulic Post Hammer

Model TDB230 Pile Driver Jiangsu,China(Mainland) Ref 10113622

Price on request

Pricing is provided on request — use the quote form below.

Port
Shanghai
Minimum Order Quantity
1 Set/Sets
Supply Ability
20 Set/Sets per Month
Payment Terms
L/C,T/T

Request a Quote

Product: Hydraulic Post Hammer

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

pile driving, extracting and drilling·photovoltaic and guardrail installation·competitive price·timely after service

Specifications

Condition New Efficiency High
Piling Speed(m/min) 1-2 m/min Place of Origin Jiangsu China (Mainland)
Model Number TDB230 Weight 2800 kg
Dimension(L*W*H) 4290*2000*2620 mm Certification ISO 9001:2000
After-sales Service Provided Engineers available to service machinery overseas Details pile driving, extracting and drilling · photovoltaic and guardrail installation · competitive price · timely after service

Packaging & delivery

Packaging DetailExport and Sea-worthy Standard Special Packing
Delivery Detail15days after receiving advance payment

Product description

1. Functions

1.1 Pile Driving Function: TDB230 Highway Guardrail Hydraulic Pile Driver and Extractor and Driller is a designed to install and maintain the highway anti-collision guard rails and guardrail posts. It is also used for the pv installation, solar cells and solar panels installation.

1.2 Pile Extracting Function: With the same equipment and hydraulic system for extracting poorly driven or incorrectly positioned posts or road maintenance work, it is a professional machine for extracting the posts out of any conditions of ground.

1.3 Pile Drilling Function: This equipment can drill the holes on the concrete road, rock, granite and other very hard road conditions, then install the posts into the holes easily.

2. Features

2.1 TDB230 Highway Guardrail Hydraulic Pile Driver and Extractor and Driller is composed of chassis, upper column, hydraulic system, hydraulic hammer, diesel engine, electric system, cooling system, control system, pile driving and extracting equipment, and pile drilling equipment. It has the characters of quick and exact positioning, compact size, lightweight, self-propelled, quick moving, humanized design, easy operation, high efficiency, low price.

2.2 When you use a tow truck or trailer to tow the machine to the working site by the towing device with high speed, first you need to lay down the upper column by hydraulic system and then put the switch of clutch with the traveling roller chain at the right position. The up and down, longitudinal and transverse shift, horizontal slide and rotation of the column are realized through hydraulic system.

2.3 The hydraulic hammer or pile drilling equipment is installed onto the upper column and be downward and upward along the track of the column for pile driving and extracting or drilling working by hydraulic system. When extracting guard rail posts, the extractable supporting foot is hydraulically positioned on the ground, for enhanced stability and safe pile extraction.

2.4 It has very famous brand diesel engine Changchai with electrical starting equipped, which has a stable performance, simple operation and maintenance and very long service life.

2.5 The control system is equipped with multiple directional control valve and centralized hydraulic control rods which makes the operation simple and convenient.

2.6 It can install piles up to 3m (9.84’) in length, but on request the machine can be supplied with extension columns which can install piles up to 3.5m (11.48’) or even 4m (13.12’) long.

2.7 The equipment does not need to turn the direction during driving and extracting the guardrail posts on both sides because of its 360° rotating device.

2.8 The pile drilling equipment adopts hydraulic system and wind-driven principle, matched with air compressor, the drilling equipment is formed of hydraulic motor, connecting device, connecting rod, pneumatic percussion hammer and drill bit. The motor is hydraulic operated, the drill is operated by compressed air.

2.9 The pile driving and extracting equipment, and pile drilling equipment share one chassis, is the most economical investment for getting the three functions. You can install each equipment onto the upper column according to your working need.

3. Main Technical Specifications

Overall Parameters

TypeTDB230
Rated Power24 KW
Power of battery for electric start500 W
Rotation Angle360°
Radius of Gyration2100 mm
Lateral Stroke350 mm
Lateral Distance860 mm
Hydraulic System Pressure16 MPa
Hydraulic System Flow50-55 L/min.
Traveling Speed0-15 km/h
Tow SpeedAround 80 km/h

Hydraulic Pile Driver and Extractor

Size (L×W×H)4290×2000×2620 mm
G.W.2800 KG
Weight of Hydraulic Hammer300 KG
Dia. Of Drill Shank70 mm
Impulsive Pressure10-16 MPa
Impulsive Frequency10-15 Hz
Displacement65 ml/r
Extracting Stroke1600 mm
Supporting Foot Stroke400 mm
Pile Driving Force per Stroke of HammerAround 250 KN
Pile Extracting ForceAround 250 KN
Working height≤3000 mm

Hydraulic Driller

Size (L×W×H)4290×2000×2620 mm
G.W.2800 KG
Rotated Speed of Hydraulic Pump2200 r/min.
Working Air Pressure0.5-0.7 Mpa
Air Flow10 m3/min.
Diameter of Drilling Holes125-180 mm
Max. Drilling DepthAround 1500 mm
Displacement150 ml/r
Rotating Speed of Drilling Equipment190 r/min.
Working Efficiency250 mm/min.

FAQ

What model is this machine?
The model number is TDB230.
Is it new or used?
Condition: New.
What are its dimensions?
Dimensions: 4290*2000*2620 mm.
How much does it weigh?
Weight: 2800 kg.
What certifications does it have?
Certification: ISO 9001:2000.
What warranty is offered?
Warranty: Engineers available to service machinery overseas.

Related products in Pile Driver