high oil yield with low cost tire recycling system

Model TL-2866 Rubber Raw Material Machinery Henan,China(Mainland) Ref 10340601

Price on request

Pricing is provided on request — use the quote form below.

Port
Lianyungang&Qingdao
Minimum Order Quantity
1 Set/Sets
Supply Ability
1 Set/Sets per Month
Payment Terms
L/C,T/T,Western Union

Request a Quote

Product: high oil yield with low cost tire recycling system

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

1. 50,000 square meters factory·2.Supported by Local Government·3.Running Pyrolysis Plant·4.ISO&CE·5.45%-50% oil yield

Specifications

Condition New Type Tire Machine
Tire Machine Type Tire Recycling Machine Place of Origin Henan China (Mainland)
Model Number TL-2866 Voltage 220V/380V
Power(W) 18KW-22KW Dimension(L*W*H) d2800*l6600*16mm (thickness)
Weight 37Tons Certification CE &ISO
Warranty 2 years free After-sales Service Provided Engineers available to service machinery overseas
Steel Q245R &Q235 pressure Normal pressure
temperature 380-400 degree Max security valve 3 pieces
alarm system pressure release automatically workers needed 3 or 4
cooling methods water cooling Details 1. 50,000 square meters factory · 2.Supported by Local Government · 3.Running Pyrolysis Plant · 4.ISO&CE · 5.45%-50% oil yield

Packaging & delivery

Packaging Detail1*40FR and 1*40HQ
Delivery Detail15-20days after deposit

Product description

The tyre & plastic pyrolysis machine details

About our company

We are specialized in manufacturing waste tire, plastic & rubber pyrolysis machine, oil distillaiton equipement, incidental tyre cut machine, carbon black refining machine and carbon black grnulator machine according to the market and customer requirements. With advancedproduction technology, high quality products, excellent sales and good afeter sale service, our products are sold both in domestic and international market.

The model and capacity:

Fuel

The fuel can be fuel oil, heavy oil, coal& firewood.

The processing time:

ModelcapacityFeedingProcessingCoolingDischargetotal
2200*60005ton2hr7-8hr2hr2hr14hr
2200*66006ton2hr8hr2hr2hr14hr
2600*60008ton3 hr10 hr3 hr3 hr19 hr
2600*66009ton3 hr11 hr3 hr3 hr20 hr
2800*600010ton3 hr12 hr3 hr3 hr21 hr
2800*660012ton3 hr13-14 hr3 hr3 hr23 hr

End product percentage (the raw material is tyre)

Machine motor Power

Packing Containers:

2200*6000

two 40HQ containers

2200*6600
2600*6000

one 40FR open container and one 40HQ container

2600*6600
2800*6000
2800*6600

The machine installation

We will give the foundation drawings to buyer after make the order .we will send engineer when buyers gets the machine. The engineer mainly installs the machine and trins your workers.

The machine covers area:

The machine itself cover 300 square meters (length 20M, Width 15M).

Add raw material stay, carbon black stay, big oil tank zone, workers rest room and simple office. It takes at least 600-800 square meters.

Workers need to operate machine:

Three or four workers are enough for one set machine.

Delivery time:

We will delivery the machine within 15-days after getting the advance payment(30% of total amount by T/T).

Port of China

Lianyungang port or Qingdao port

Working process

Firstly, two or three workers put the raw material into the furnace, seal the feed inlet, and then burn the coal or wood in the bottom of the furnace. The waste raw materials in thereactor will be heated slowly. The oil steam will be produced when the temperature reach 180°C-400°C. And then the oil steam will be separate to light component and heavy component by separate device. The light component will enter into the condenser and meanwhile the residues will be discharged automatically in succession. After cooling, the liquefied part will be crude oil, and the waste gas (this part can not be liquefied) will return to heating supply system to be burned by combustion gas purification system.

The analysis of economic benefit

The warranty and after-service

1) We will supply the foundation drawings to buyer after get deposit.

2) The delivery time is 15-20 days after get deposit.

4) We warranty the complete machine two years, we will maintenance all it life.

At last, we are looking forward to good cooperation with you!

FAQ

What model is this machine?
The model number is TL-2866.
What type of machine is it?
It is a Tire Machine.
Is it new or used?
Condition: New.
What power does it require?
Power requirement: 18KW-22KW.
What voltage does it operate on?
Operating voltage: 220V/380V.
What are its dimensions?
Dimensions: d2800*l6600*16mm (thickness).
How much does it weigh?
Weight: 37Tons.
What certifications does it have?
Certification: CE &ISO.

Related products in Rubber Raw Material Machinery