Gypsum power production line
Price on request
Pricing is provided on request — use the quote form below.
- Port
- tianjin china
- Minimum Order Quantity
- 1 Set/Sets
- Supply Ability
- 15 Set/Sets per Year
- Payment Terms
- L/C,T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
gypsum power production line·1 full automatic·2 professional installation team·3. low investment and consumption
| Place of Origin | Hebei China (Mainland) | Model Number | 001 |
|---|---|---|---|
| After-sales Service Provided | Engineers available to service machinery overseas | color | blue |
| quality | CE certificate and ISO certificate | warranty | one year |
| installment | under the engineers guidance | after sales service | whole life |
| Configuration | high Configuration | Business type | manufacture |
| Experience | 10 years rich experience | Control system | PLC control system |
| Tech | Europe | Details | gypsum power production line · 1 full automatic · 2 professional installation team · 3. low investment and consumption |
| Packaging Detail | 1) Standards export packing which fit for long time delivery 2) Seaworthy packing.Use 20GP,40GP and 40HQ containers and frame containers. |
|---|---|
| Delivery Detail | usually 3 months after receiving your down payment |
Gypsum powder production line
Annual Capacity: 10,000 t-500,000 t
The gypsum powder production line of which the material is natural gypsum, are equipped with many advanced technological equipment in domestic and foreign such as material averaging device, double-grade crushing system, plate type conveyor, vertical mill, Ramon mill, gypsum boiling kiln, cooling machine and waste heat recycling system, ect. The boiling kiln is widely used in our nation with the advantages of small, simple, great output, small occupied area, easy control, perfect gypsum microstructure, stable physical properties and low running cost. It has been sold to Thailand, Uzbekistan, Columbia and Mexico along with our production line
Quality Standard
The quality of building gypsum is in accordance with Chinese National Standard “Gypsum Powder” (GB9776-2000), and should meet the following requirements:
| Grinding Fineness | ≤0.20mm |
| Building gypsum calcination temperature | ~160°C |
| Packing temperature | ≤100°C |
| Qualification rate | ~95% |
the introduction of the art of the calciner
With the development of the gypsum industry, the need of the gypsum powder is increasing in various fields. The leads to our high demands to the gypsum powder. Now, the production craft of the gypsum powder is also improving. During the production and process, the drying and dehydrating precess is the key point, and they are also difficult to master. Due to this phenomenon, after long terms research, we develop a new kind of dehydrated equipment-calciner which can meet all the requirements for gypsum powders production.
Simple structure; it is not easy to demage;
space-saving; intensive-equipment
the low cost of energy;
high quality; the content of the hemihydrate is ideal; the physical property is stable
the allocation of the staff
The Crusher system: 2 person/day(including the forklift driver)
The Mill system: 1 person/8hours(that is 3 people/day)
The Calcined system: 1 person/8hours(that is 3 people/day)
The Heat Supply system: 2 person/8hours(that is 6 people/day)
Electrical engineering: 1 person/day
Machinery maintenance: 1 person/day
Total: 16 person
the calculation of the output
The time of production: 300 days/year* 24hous
The hour output:≥8.5ton/hour(the powder of finished product)
5. (GB9776-88)relative parameter
Finess:≥100mesh
Flexural Strength(having a direct relation to raw material):≥1.8Mpa;
The Strength of Anti-pressure: ≥3.0Mpa
Main Contents: Hemihydrate:≥80%(adjustable);Gypsum:<5%(adjustable)
Soluble Anhydrous: <5%(adjustable)
The initial setting time:3-8min(adjustable);
the final setting time:6-15min(adjustable)
consistency:65%-75%(adjustable)
6. the requirement of the place
(the store-square of the raw material and the finished product warehouse is not included)
25 meters * 15 mete
NATURAL GYPSUM POWDER PICTURES
DESULFURIZATION GYPSUM POWDER MACHINE
Contact with Alina Ma (0086 15028173723)
Highly effective vibration powder sifter made in Japan [BLOWER SIFTER]
ZDH30 Plate Vibration Machine
LMT5311TFC Synchronous Chip Sealer
mini tractors with front end loader
stone jaw crusher
Popular QLS8S concrete asphalt scarifier