Gas beer equipment-heat exchanging,

1 high quality of the Beer equipment2 competitive price3 highly automatic4 materlai: sus 304 or red copper - details see: https://www.machineto.com/gas-beer-equipment-heat-exchanging-10023982
Processing:Fermenting Equipment,fermentingCondition:NewPlace of Origin:Shandong China (Mainland)Brand Name:HD
Model Number:ZH-0.8Processing Types:AlcoholVoltage:220V/240V/380VPower(W):80kw~200kw
Dimension(L*W*H):100*200*200Weight:200kgCertification:CE/ISO9001Warranty:12 months
After-sales Service Provided:Engineers available to service machinery overseasColor:SilverMaterial:Stainless steel 304/copperInsulation Material:Polyurethane
Control system:PLC automatic controlHS code:843840010  
Gas beer equipment-heat exchanging,
contact supplier for Gas beer equipment-heat exchanging,


We will take full responsibilities for designing, manufacturing, installing the beer equipment and producing the first brew.

Now, let me show you the simple introduce of our beer equipment:

(Munich craft brewing)

Beer Equipment Introduce

Item

Equipment list

Name
Milling System01Malt Miller

Saccharification System

01Boil spin heavy pot (red copper)
02Saccharification filter slot (red copper)
03Saccharification wort pump
04Saccharification pipelines and valves
05Plate heat exchanger
06Platinum resistance temperature instrument

Fermentation System

01Fermentation tank
02Fermentation pipelines and valves
03Platinum resistance Temperature instrument

Refrigeration System

01Glycol ice water tank
02Refrigerating Unit
03Ice water circulating pump
04Ice water pipelines and valves
05Platinum resistance Temperature instrument

Washing and sterilization System

01Washing pump
02Alkali liquor washing tank
03Alkali liquor washing tank

Control System

01Saccharification Control
02Fermentation Control
03Refrigeration Control
04Washing Control

Accessory

01&25 Hose
02&38 Wired hose
03Iron shell thermometer
04Stainless steel four- way valves
05Stainless steel reducing nipple
06Butterfly pads
07Brix plan with temperature
08Inflatable head
09Bad rake exit
11Measuring cylinder

The whole bar equipment adopts the best insulate material-polyurethane, the

best pumps, valves and pipes.

We can supply 100L,200L,300L,500L,1000L,2000L capacity beer equipment.

Tell me your remands and I will give you a list which can meet all your requirments best.

Wishing for your inquiry and visit to our company.

Gas beer equipment-heat exchanging,
Packaging Detail:wooden case or others
Delivery Detail:35 days

Related Product for Gas beer equipment-heat exchanging,


Warning: Cannot modify header information - headers already sent by (output started at /home/machineto/machineto.com/sys/db_mysqli.php:1) in /home/machineto/machineto.com/app/ctrl/productCtrl.php on line 208