Full Automatic rendering machine for sale Say no for project delay
| Condition:New | Automatic Grade:Automatic | Power(W):1.5KW | Rendering Thickness:25 mm |
| Rendering Height:5 m | Place of Origin:Hebei China (Mainland) | Brand Name:ZB | Model Number:ZB800-4A |
| Dimension(L*W*H):800*650*480MM | Weight:150KG | Warranty:18 MONTHS | Plastering thickness:2-25mm |
| Plastering width:80cm or 100cm | Voltage:220V 380V or others | Color:Blue,yellow | Plastering effection:Very smooth |

Say no for project delay!
Full Automatic rendering machine for sale
ZB800-2AAuto Platering Rendering machine also called plaster machine, wall plastering machine, automatic plastering machine, plastering machine for wall, which is a unique machine for wall rendering, it is designed for increasing rendering efficient and saving labor cost of rendering project.
Automatic plastering machine's main features:
1. It is new machine instead of handmade in construction plastering area.
2. The capacity is as 15 professional plasterers.
3. The quality is subject to international wall plastering standard.
4. Very easy and simple to operation
5. Saving more than 20% raw material (cement &sand)
6.It can plaster the wall automatically and go up and down automatically.
7.It can plastering by one-time.The thickness of the ash can be adjusted.
8.Easy to move,without removing any parts of the machine.
9.It has large capacity hopper,you can put the ash/lime/gypsum in it one-time.
10.Easy to operate.One or two person can operate.
11.The quality is up to the international standard.Leakage protection device with high sensitivity, suitable for construction site safety and reliability
Technical data of automatic plastering machine:
ZB800-2A Technical data | |
| Plastering Height | 0-5meters |
| Plastering Thickness | 2-25mm |
| Plastering Width | 80cm |
| Capacity | 450 square meters/8 hours |
| Dimensions | 1350×800×500mm |
| Power supply | 2.2kw |
| Voltage/frequency | According to your demands |
| Weight | 195KG |
| Surface | smooth |
| Vibrator | Yes |
| Juncture device | Yes |
| Smoothing knife | Yes |
| storage capacity | 90-100KG |
| Perpendicularity degree | ≤2mm |
| Level degree: | ≤2mm |
Automatic plastering machine VS Manual Work
Applications:
• Application on brick or block walls
• Render cement mortar
• Render gypsum mortar
• Render lime mortar
• Render ready mix
More pictures:(Two model rendering machine for choose)
Other product:
Mortar spraying machine
If you are interested,pls contact me:

| Packaging Detail:standard export wooden cases |
| Delivery Detail:within 3 days |

