foundation pile driving
Price on request
Pricing is provided on request — use the quote form below.
- Port
- Shanghai
- Minimum Order Quantity
- 1 Set/Sets
- Supply Ability
- 20 Set/Sets per Month
- Payment Terms
- T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
1.Low Energy Consumption·2.High Efficiency and High Reliablity·3.Flexibility in designing
| Condition | New | Efficiency | 99.99% |
|---|---|---|---|
| Place of Origin | Jiangsu China (Mainland) | Model Number | ZYS |
| Weight | 60-1200T | Dimension(L*W*H) | 13.0m*7.0m*3.0m |
| Certification | ISO9001:2000 | Details | 1.Low Energy Consumption · 2.High Efficiency and High Reliablity · 3.Flexibility in designing |
| Packaging Detail | Container packing(export standard package) |
|---|---|
| Delivery Detail | 35-45 working days |
1.Low Energy Consumption
We use variable hydraulic system with low loss and constant power in this series of products and apply merging hydraulic system in the main parts of the machine and the crane ,so that energy consumption decreases by 30%,and working efficiency increases by 60%.
2.High Efficiency
To ensure the high working efficiency of the whole machine ,we use hydraulic system with big power and great flow,the pile driving mechanism with muti-speed control and being quick in getting ready for operation .We also use the hydrauic system where oil flow can merge to comsuption for each other between the main machine and crane .
3.High Reliablity
To ensure the high reliability of our products which engineering machines should possess,we improve the design and use very reliable materials or componts which we select carefully in the process of purchasing.
4.Convenience in dismantling,transportation and maintenance
Compared with the pile drivers made by other companies ,ours are more convenient to taken apart and shipped as the connection and lay out of the long boat and the short boat are different .
It can be opened at the middle so that the lifting arm of the crane can pass through it during transportation .Besides,the side pilling mechanism can be taken off so as to reduce the leghth of machine to be shipped and greatly reduce the weight of separated units in transportation .
5.Systemization and maximization of our products
6.Flexibility in designing
For example ,we can ,if any customer requires ,installa a position –controller for the crane ,and a digital screen showing the tonnage of pilling force ,etc.
Side pile structure:
Move the piling structure to the stand behind the machine body the machine body if the side or corner pile should be handled ,press pile with the use of bolts and axle pins to fix in the range of 1.38M from side .at the same time dispose the corner side and the minimum distance of corner pile is not more than 2.8M.