foundation pile driving

Model ZYS Pile Driver Jiangsu,China(Mainland) Ref 10113119

Price on request

Pricing is provided on request — use the quote form below.

Port
Shanghai
Minimum Order Quantity
1 Set/Sets
Supply Ability
20 Set/Sets per Month
Payment Terms
T/T

Request a Quote

Product: foundation pile driving

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

1.Low Energy Consumption·2.High Efficiency and High Reliablity·3.Flexibility in designing

Specifications

Condition New Efficiency 99.99%
Place of Origin Jiangsu China (Mainland) Model Number ZYS
Weight 60-1200T Dimension(L*W*H) 13.0m*7.0m*3.0m
Certification ISO9001:2000 Details 1.Low Energy Consumption · 2.High Efficiency and High Reliablity · 3.Flexibility in designing

Packaging & delivery

Packaging DetailContainer packing(export standard package)
Delivery Detail35-45 working days

Product description

1.Low Energy Consumption

We use variable hydraulic system with low loss and constant power in this series of products and apply merging hydraulic system in the main parts of the machine and the crane ,so that energy consumption decreases by 30%,and working efficiency increases by 60%.

2.High Efficiency

To ensure the high working efficiency of the whole machine ,we use hydraulic system with big power and great flow,the pile driving mechanism with muti-speed control and being quick in getting ready for operation .We also use the hydrauic system where oil flow can merge to comsuption for each other between the main machine and crane .

3.High Reliablity

To ensure the high reliability of our products which engineering machines should possess,we improve the design and use very reliable materials or componts which we select carefully in the process of purchasing.

4.Convenience in dismantling,transportation and maintenance

Compared with the pile drivers made by other companies ,ours are more convenient to taken apart and shipped as the connection and lay out of the long boat and the short boat are different .

It can be opened at the middle so that the lifting arm of the crane can pass through it during transportation .Besides,the side pilling mechanism can be taken off so as to reduce the leghth of machine to be shipped and greatly reduce the weight of separated units in transportation .

5.Systemization and maximization of our products

6.Flexibility in designing

For example ,we can ,if any customer requires ,installa a position –controller for the crane ,and a digital screen showing the tonnage of pilling force ,etc.

Side pile structure:

Move the piling structure to the stand behind the machine body the machine body if the side or corner pile should be handled ,press pile with the use of bolts and axle pins to fix in the range of 1.38M from side .at the same time dispose the corner side and the minimum distance of corner pile is not more than 2.8M.

FAQ

What model is this machine?
The model number is ZYS.
Is it new or used?
Condition: New.
What are its dimensions?
Dimensions: 13.0m*7.0m*3.0m.
How much does it weigh?
Weight: 60-1200T.
What certifications does it have?
Certification: ISO9001:2000.

Related products in Pile Driver