double cage rack and pinion construction hoist

Model SC120/120 Construction Lifter Hunan,China(Mainland) Ref 10097955

Price on request

Pricing is provided on request — use the quote form below.

Port
China main port
Minimum Order Quantity
1 Set/Sets
Supply Ability
2000 Set/Sets per Year
Payment Terms
L/C,T/T

Request a Quote

Product: double cage rack and pinion construction hoist

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

high efficiency.·overload alarm device.·energy saving and economy.·double cage rack and pinion construction hoist.

Specifications

Condition New Place of Origin Hunan China (Mainland)
Model Number SC120/120 Rated Loading Capacity(kg) 2*1200kg
Hoisting Speed 33m/min Max Lifting Height 200m
Dimension(L*W*H) 650*650*1508mm After-sales Service Provided Engineers available to service machinery overseas
color red cage single
electric motor power 2*2*11kw safety protector SAJ30-1.2
sling type rack and pinion usage material and passenger hoist
cage weight 2*1400kg Details high efficiency. · overload alarm device. · energy saving and economy. · double cage rack and pinion construction hoist.

Packaging & delivery

Packaging Detail40HQ Container,wood box.
Delivery Detail20-30days after receipt of 30%down payment

Product description

WORLD CONSTRUCTION BUILT WITH CCBT

We have been engaging in construction machinery industry for 10 years.

double cage rack and pinion construction hoist

double cage rack and pinion construction hoist

Product Introduction

1. It is equipped with fully safety devices to guarantee the safe working, such as anti-dropping device, short circuit protection, phase failure protection, phase open protection, top-bottom limitation and limitation switchboard of suspension cage, electrical and mechanical interlock device mounted on lower cage.

2. Stable running and comfortable adaptability. The driving unit was designed to locate at top of suspension cage, which enlarges the inner space of the cage. And it has more stable transmission and less vibration, which provides construction workers a comfortable and spacious working environment.

3. The transmission system adopted two or three driven motors and three sets of gear reducer, as two independent devices. Every motor is equipped with DC drive , electromagnetic brake, and the friction brake unit has auto-tracking function to adjust the braking clearance automatically, so that to improve the braking performance. The equipment adopted planar double-enveloping worm gear reducer which could be about 4-5 times of general worm gear’s lifetime.

4. It has simple electrical control system, and convenient to be maintained and low failure rate. It is known for their stable performance, reliable safety, easy transportation and strong adaptability, can greatly enhance work efficiency and reduce labor intensity.

5. It is widely used in the field of industrial and civil residential construction, bridge construction, underground construction, large chimney construction, ship industry, etc. Being suitable for the vertical transport of material and human .they can also be used as permanent / semi-permanent electric elevators in various environments like warehouses and high towers.

Main parametres of construction hoist SC120/120

TypeSC120/120
Rated Loading Capacity(kg)2*1200
Max.Lifting Height(m)200
Lifting Speed(m/min)0-33
Mast Section(mm)650*650*1508
Cage Weight(kg)2*1400
Electric Motor Power(kw)2*2*11
Safety ProtectorSAJ30-1.2

FAQ

What model is this machine?
The model number is SC120/120.
Is it new or used?
Condition: New.
What is it used for?
Applications include material and passenger hoist.
What are its dimensions?
Dimensions: 650*650*1508mm.
What warranty is offered?
Warranty: Engineers available to service machinery overseas.

Related products in Construction Lifter