dongfeng 6*4 EQ1208GJ5 water truck
Dongfeng 6*4EQ1208GJ5, water truck 20tons, tanker truck fact cubage 25cbm, Thickness 5mm Material,carbon steel,stainless ste - details see: https://www.machineto.com/dongfeng-6-4-eq1208gj5-water-truck-10112697
| Drive Wheel:6x4 | Fuel:Diesel | Transmission Type:Manual | Condition:New |
| Sprinkling Area (m):12 - 16m | Emission Standard:Euro 3 | Engine Capacity:6 - 8L | Tank Volume:15001 - 30000L |
| Dimensions (L x W x H) (mm):9900*2490*3350 | Brand Name:hys | Place of Origin:China (Mainland) | Certification:3c |
| Warranty:one year | After-sales Service Provided:Overseas service center available | chassis:EQ1208GJ5 | Cubage:18-24ton |
| Overalldimension:9995*2495*3185 | Engine:YC6J220-30 | hp:150-240hp |

dongfeng 6×4 EQ1208GJ5 water truck
Vehicle Description | |||
| Type | 6*4 water truck | Overall dimensions(mm) | 9995*2495*3185 |
| GVW (kg) | 21735 | Mass in working order (kg) | 10040 |
| Fact cubage | 20 cbm | Max speed (Km/h) | 90 |
Chassis Description | |||
| Chassis Model | EQ1208GJ5 | Cab | Half row |
| Allowable Passengers In Cab | 3 | Air conditioner | optional |
| Wheel base(mm) | 4350+1300 | Number of axles | 3 |
| F/R track base(mm) | 1940/1860 | F/R overhang(mm) | 1245/2465 |
| Approach/Departure angle(°) | 32/14 | Spring plate | 8/13 |
| F/R axle-load | / | Type of fuel | diesel |
| Tire specification | 10.00-20 | Tire quantity | 10 |
| Traction system | 6*4 | Operation control system | Power Steering |
| Transmission | 6-speed | Electric system | 24v |
Engine Description | |||
| Engine model | EQB210-20 | ||
| Exhaust/output | 5880/155 | Horse power | 210 |
| Engine Manufacturer | Dongfeng Cummins Engine Co., Ltd. | ||
Up-parts Description | |||
| Tank Dimensions(mm) | 6850*2380*1580 | ||
| Tank Description | 1. Shape: oval 2. Material: carbon steel 3.Thickness: 4 mm All water truck can be make water wagon for transporting drinking water. | ||
| Standard Equipment | Equipped with Hangzhou Weilong pump(suction lift>6m) Equipped with fire valve, water valve, and filter gauze | ||
| Optional Equipment | Shower ,pneumatic valve,Honda pump,tool box | ||
| Production cycle | 10-20 days | ||
| Warranty | 12 month, from the date of supply | ||
| FOB,CIF,etc | / Unit | ||

| Packaging Detail:nude packing |
| Delivery Detail:10 to 20 days |

