Construction ZLP Suspended Construction Platform/Window Cleaning Machine
Breif introduction
(2) Application: High rise elevator, cableway installation, granary, security inspection, tower hoist driver's lift, boiler maintenance, dam and bridge maintenance and so on.
(3) Counterweight: 300KG-1000KG
Lifting speed: 9-11m/min
Lifting height: 100m
Voltage: 220V, 220V, 380V, 415V, 440V, etc
Phase: Single phase or Three phases
Frequency: 50HZ or 60HZ
We can design special products according to customers' requirement.
Welcome!
Parts contains:
1. Suspended Cage: Steel or Aluminum Alloy (powder coating or hot galvanization)
2. Suspension Mechanism: Steel (powder coating or hot galvanization)
4. Safety Lock: LSF30
5. Electric control box: Schneider brand
6. Steel wire rope: 8.3mm or 9.1mm
7. Power cable: 2.5 mm²
8. Counterweights: Cement or Cast Iron
9. Spare parts
Parameters of Construction ZLP Suspended Construction Platform/Window Cleaning Machine:
| Model | ZLP250 | ZLP500 | ZLP630 | ZLP800A | ZLP800S |
| Material | Steel or Aluminum Alloy |
| Rated Capacity(kg) | 250 | 500 | 630 | 800 | 800 |
| Lifting Speed (m/min) | 9-11 | 9-11 | 9-11 | 8-10 | 8-10 |
| Motor Power (kw) | LTD5 | LTD5 | LTD6.3 | LTD8 | LTD8 |
| Platform Length (m) | 2.5 | 5 | 6 | 7.5 | 7.5 |
| Counterweights (kg) | 625 | 750 | 900 | 1000 | 1000 |
| Diameter of Wire rope (mm) | 8.3 | 8.3 | 8.3 | 8.6 | 8.6 |
| Standard lifting height (m) | 100 | 100 | 100 | 100 | 100 |
Products photos:
Application:
1. High-rise building: Decoration, construction for external wall, installation of curtain wall and external components, repairing, checking, maintenance and cleaning for external wall
2. Large-scale project: construction, repairing and maintenance for large tank, chimney, dams, bridges, derrick
3. Large ships: welding, cleaning and painting
4. billboard: installation billboard for high-rise building
Quality Control & Packing:
Certificates:
Superiority:
1. We had already passed the authorization by ISO9001:2008 and CE and established a complete set of quality assurance system.
2. Under such a complete set of quality assurance systems, there is a complete set of regulations for ordering, order handling, quality design, purchasing raw materials, working out production plan, production, test and inspection, packaging, storage, delivering, trace, keep in touch with clients, etc.
3. The CNC control center and PC-based production and marketing system not only improves the working efficiency but also assures the products quality.
4. Our test lines are equipped with a large amount of online test instruments, so that they can ensure and improve the products quality.
5. We also have a complete set of equipment and techniques for testing and controlling the performance of products, which ensures our Construction ZLP Suspended Construction Platform/Window Cleaning Machine to take a leading position among the fellow products at home and reach the international standard.