construction elevator
Price on request
Pricing is provided on request — use the quote form below.
- Port
- Qingdao port
- Minimum Order Quantity
- 1 Set/Sets
- Supply Ability
- 1000 Set/Sets per Year
- Payment Terms
- L/C,T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
1.The Mast section is made of seamless pipe·2.durable and easy to use·3.single cage or double cages·4. after-sales service
| Condition | New | Place of Origin | Shandong China (Mainland) |
|---|---|---|---|
| Model Number | SC100 | Rated Loading Capacity(kg) | 1000kg |
| Hoisting Speed | 33m/min | Max Lifting Height | 250m |
| Loder Weight | 1T/cage | Color | Red or blue or your requirement |
| Cage size | 3.0 *1.3 *2.2 | Protection level | IP55 |
| Model of fall arrestor | SAJ4.0~1.2 | Service | Installation technique |
| Usage | High buildings, Tower, Chemny, Bridges and so on. | Details | 1.The Mast section is made of seamless pipe · 2.durable and easy to use · 3.single cage or double cages · 4. after-sales service |
| Packaging Detail | container in nude(40HQ) |
|---|---|
| Delivery Detail | within 15 days after order |
SC/SCD series construction elevator
Adopting advanced technology, it can also be equiped with electrical overload warming device, auto landing-call equipment or autimatic leveling device according to your requirement.
1.High precise accessories and durable main parts
2.Good qualified raw materials and strict producting techniques
3.GB/T19001-2000-ISO9001:2000 certificate of quality
4.Adopt international standards approval certificate
Main structure of the product
a. Cage:single or double
b. Master section:Adopt Welding Robort to weld, reliable in quality and elegant in appearance.
c. Cabin(operating board):provide a comfortable environment for the driver
d. Attanchment frame:the connection device between frame rail and building to ensure the stability of frame rail and all the structure.
e. Safety device: floor-call device, autimatic leveling device, overloading warming device and so on.
All the structure adopt Tooling fixed technology to ensure stable perfomance and stability
Type specification: SC100
| Main technical parameters | Unit | Value |
| Rated load | kg | 1000 |
| Rated erection load | kg | 1000 |
| Jib attachment rated load | kg | 200 |
| Cage size | m | 3.0*1.3*2.2 |
| Maximum lifting height | m | 250 |
| Lifting speed | m/min | 33 |
| Rated power | kw | 11*2 |
| Rated voltage | V | 380 three-phrase |
| Rated frequency | Hz | 50 |
| Rated current | A | 23.2*2 |
| Fuse protection current | A | 63 |
| Protection level | / | IP55 |
| Triggering speed of safety device | m/s | 1.1 |
| Braking distance | m | 0.15--1.4 |
| Enclosure weight | kg | 780 |
| Cage weight | kg | 1522 |
| Mast section weight | kg | 121 |
| Mast section size | mm | 650*650*1508 |
| Colour | / | Red/blue |
(Inspection Site)
(Construction Site)
(Betop Exhibition)
(The Details)
(Transport to Qingdao port)
(The new samples)
General hoist with twin cage material hoist
single cabin construction hoist SC120
New 1ton Building Hoist SC100
XCMG 14m Aerial work platform XZJ5067JGK
construction freight lifter
CD1 Wire Rope Electric lifter construction machinery