Carbonated Beverage Production Line/Processing Machine

Carbonated Beverage Production Line/Processing Machine, 1,Used:Carbonated soft drinks, 2,Isotonic filling, 3:Capacity:200-2000ml - details see: https://www.machineto.com/carbonated-beverage-production-line-processing-machine-10056404
Type:Filling MachineCondition:NewApplication:Food,BeveragePackaging Type:Cans,Bottles
Packaging Material:PlasticAutomatic Grade:AutomaticDriven Type:ElectricVoltage:380V/50HZ
Power:5.4KWPlace of Origin:Jiangsu China (Mainland)Brand Name:RendaModel Number:DCGF 24-24-8 filling machine
Dimension(L*W*H):2830*2030*2030MMWeight:3800KGCertification:CE,ISOAfter-sales Service Provided:Engineers available to service machinery overseas
Production Line:Carbonated Beverage Production Line/Processing Machinemain material:SUS.304/316Processing:Filling MachineProcessing Types:Carbonated Beverage,soft drinks
filling machine model:DCGF24-24-8 filling machinefilling machine caacity:8000-10000B/Hfilling vol:250-2000mlfilling bottle:PET/Glass
Carbonated Beverage Production Line/Processing Machine
contact supplier for Carbonated Beverage Production Line/Processing Machine


Carbonated Beverage Production Line/Processing Machine

DCGF Series filling machine

Introduction:

(1)The suspending bottleneck clamping design make the bottle stable during the high-speed moving conditions. By changing a few parts, it can meet the need of production of different types of bottles easily.
(2)The new generation of stainless steel grab is adopted and the grabs have no contact with the area above the bottle"s screw thread. Nozzles in the grab can guarantee the complete wash of the interior of the bottle.
(3)The advanced micro negative -pressure filling technology used in this machine makes the filling quick, steady and accurate. The beverage-holding tank is fully-closed and also, temperature-control device and CIP washing interface are installed
(4)This machine,before capping, bottle-mouth will be cleaned by R.O. Washing device.
(5)Magnetic torque is used for screw capping, and the power of screw capping can be adjusted steplessly. Capping is reliable and do no harm to the caps.
(6)Advanced technologies, such as human-machine interface touch-screen and PLC computer program control are adopted in this machine.
(7)All parts that have direct contact with the beverages are made of high quality stainless steel. And many critical components such as the decelerator, the motor, are from famous international companies.
Carbonated Beverage Production Line/Processing Machine
Main Technical Standards
Model12-12-616-16-618-18-624-24-832-32-1040-40-1060-50-15
Production Capacity(bph)(500ml)30005000600010000130001500018000
Way of Filling

Balanced Pressure Filling

Filling Feedback Quantity

<8%

Applicable Bottle Type

Bottle Diameter :50-100mm,Height150-320mm,Volume330-1500ml

Gas Source Pressure(Mpa)

0.6

Gas Consumption(m3/min)0.20.20.40.40.50.550.6
Total Power(kw)4.64.65.46.48.079.5811.8
Total Weight(kg)25003200380052006500800011000
Dimension(L*W*H)(mm)2350*1700*
2150
2600*1830*
2030
2830*2030*
2030
3220*2300*
2600
3450*2510*
2710
3800*2800*
2710
4510*3400*
2900
Carbonated Beverage Production Line/Processing Machine

Carbonated Beverage Processing Machine

Washing:

Filling:

Capping:

Carbonated Beverage Production Line/Processing Machine

ZhangJiaGang Renda Packaging Machinery Co.,Ltdis a professionalManufacturer and supplier of Carbonated beverage production line in China. Meanwhile, we also provide water filling machine,Juice/Tea drink filling machine,Beer Filling machine,PET/Aluminium/Iron Can Filling machine,water treatment equipment, blow molding machine, Bottle Unscrambler ,shrink labeling/packing machineand so on.

Carbonated drink Filling Machinehas received ISO 9001:2000,CE certification.For more detailed information about our .Please feel free to contact us.

Remarks:

1. Price term: FOB SHANGHAI.

2. Payment term: 30% BY T/T or lc as deposit before production, the balance should be paid OFF before shipment.

3. If we don’t performance of the contract, we will pay for the 30%(need to discuss) of total amout as the penalty for you.

4. Delivery time: after contract 30 days and receive the payment.

5. WARRANTY: One year gurantee for machine AND MOULDs.

6. PRICE VALIDITY: AVAIBLE WITHIN 25 DAYS.

7. Installation: Our company takes responsibility for installation. Make sure the equipment work normally. It will take LESS THAN 3 weeks to install the machines and the installation time is decided by you after you get the machines.

8. Training: we can train the workers for you for free,and also train 2-3 engineers of you.

9. Testing: we testing the machine before shipment. after we install the machine,we will test it again to make sure it will work normally.

10. Payment for Our engineer: You need to pay 50(USD) one person one day to repair machine in your country.IF the time is 3 WEEKS, THAT WILL BE 1050 USD for one engineer to install the machine.

11. MOQ: 1set

12. Package: outside wooden packing

Carbonated Beverage Production Line/Processing Machine
Packaging Detail:Carbonated Beverage Production Line/Processing Machine:wooden packing.
Delivery Detail:Carbonated Beverage Production Line/Processing Machine:40 days

Related Product for Carbonated Beverage Production Line/Processing Machine