building gypsum powder production line equipment

Model wx-45 Other Construction Machinery Hebei,China(Mainland) Ref 10099086

Price on request

Pricing is provided on request — use the quote form below.

Port
TIANJIN
Minimum Order Quantity
1 Set/Sets
Supply Ability
15 Set/Sets per Year
Payment Terms
T/T

Request a Quote

Product: building gypsum powder production line equipment

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

building gypsum powder production line equipment·1 ISO certification·2 supply long time technical service·3 competitive pric

Specifications

Place of Origin Hebei China (Mainland) Model Number wx-45
annual output 30000ton/year-240000ton/year name building gypsum powder production line equipment
one hoist two electromagetic vibrating feeder
three raymond milling machine four distribution cabinee
five vertical fry pan six burner
seven induced draft pan eight refractory bricks
Details building gypsum powder production line equipment · 1 ISO certification · 2 supply long time technical service · 3 competitive pric

Packaging & delivery

Packaging Detailwooden packing/20'container/40'container
Delivery Detail60 DAYS

Product description

building gypsum powder production line equipment

Working theory

1.the main part of boiling furnace is composed ofthin and dense radiator pipes, whichis filled with conduction oil to release the heat to the inside of the furnace.

2.Equipped at the bottom of the furnace, theroots blowermakes thepowderinside the furnace into theboiled state. The powder material, backed and dehydrated with crystallization water at certain temperature flow out through the outlet automatically.

3.The gypsum powder produced by this procedure hasstable quality and well controlled crystallization water rate, initial and final set time.

4.Further more, by usingdry electrostatic cleaner, the equipment has over95% dustcollectionefficiencyand eliminate the dust pollution.

Gypsum powder equipment adopts boiling furnace, high-voltage electrostatic dust removing and other advanced equipment.

capacity30,000 ton/year~240,000 ton/year
Automationfully automatic
Calcination systemusing boiling furnace to calcine, adopting heat conductive oil furnace as heat source
Fuelcoal, natural gas, heavy oil, diesel oil
Main materialsnatural gypsum rock, desulfurization gypsum, dephosphorizaiton gypsum
Standard of product qualityIn conformity with national standard “GB/T 9776-2008 construction gypsum

Advantages

1.Simple and sustainable structure

fluidization material:easy to built and almost free of maintenance.

low temperature heat source:furnace won't be damaged by over heating and has longer operating life.

2. Compact design and less space requirement

vertical arrangement

dust catcher on the top of the furnace body

the system saves space and avoids condensation of the dust catcher.

3. Low energy consumption

4.Good quality, ideal composition of paris, stable physical

FAQ

What model is this machine?
The model number is wx-45.

Related products in Other Construction Machinery