Automatic Leveling Machine 3-2
Price on request
Pricing is provided on request — use the quote form below.
- Port
- Shanghai
- Minimum Order Quantity
- 1 Set/Sets
- Supply Ability
- 40 Set/Sets per Month
- Payment Terms
- L/C,T/T
Price on request
Pricing is provided on request — use the quote form below.
Something wrong with this listing? Report it
Automatic Leveling Machine·1. PLC control·2. Exported to Europe·3. 18 months warranty·4. CE certification
| Condition | New | Type | Straightener & Cutter |
|---|---|---|---|
| Use | Sheet | Place of Origin | Jiangsu China (Mainland) |
| Model Number | W43G | Voltage | 380V 50Hz |
| Power(W) | According to model | Dimension(L*W*H) | According to model |
| Weight | According to model | Certification | CE |
| Warranty | 18 months | After-sales Service Provided | Engineers available to service machinery overseas |
| Motor | WUXI, China | Pump | HCHC,China |
| Axletree | ZWZ,China | Electric components | Schneider, France |
| Seal in the cylinders | NOK, Japan | Hydraulic valves | Yuken |
| PLC | DELTA | Touch Screen | DELTA |
| USE 1 | LEVELING PLATE | USE 2 | STRAIGHTNING METAL PLATE |
| Details | Automatic Leveling Machine · 1. PLC control · 2. Exported to Europe · 3. 18 months warranty · 4. CE certification |
| Packaging Detail | Normal packing in complete machine,accessories packing in wooden crate |
|---|---|
| Delivery Detail | According to the model,with large quantity in stock |
Automatic Leveling Machine
Components of Automatic Leveling Machine :
The leveling roller and multiple sets of support roller constitute the four-high roller structure of the four-high Automatic Leveling Machine .
Technical Parameters of Automatic Leveling Machine
Conditions of Sale | ||
| 1 | Time of delivery | 60 working days after received 30% T/T deposit |
| 2 | Payment Terms | 30%T/T deposit, 70% T/T before shipment |
| 3 | Packing | Normal packing in complete machine, accessories packing in wooden crate |
| 4 | Guarantee | 18 Months from the date of the machine start-up, except for the usable materials and excluded our technical visits |
| 5 | Saleservice | Freely offer operation manual and quality certification. Freely offer one set of installation and maintenance tools. |
| 6 | Installation | Cost for installation at worksite according to buyer. |
QUALITY MEASURE
1). Quality assurance system
Company organizes the production as per ISO9001:2008 standard. From design control, process control, inspection control to delivery, installed and service, the whole process control. The running of quality system performs quality manual, procedure files, work instruction and related technical and management standard together with standard and regulation layout by company strictly. Quality system realizes whole screw and whole procedure control completely.
2). Quality assurance procedure for important out-source parts.
a. Mainly out-sourced parts: control system, cylinder, hydraulic components, motor, pump etc.
b. After evaluation, select qualified suppliers as business partners.
c. Purchasing according to plan, purchase contract, quality requirement, technical standard and inspection standard.
d.
TECHNICAL SERVICE &. OPERATOR TRAINNING
1). Design examine
When designing and manufacturing the machines, manufacturer should be as per ISO9001 standard strictly to assure the system be performed effectively. According to contract requirement, to supply quality eligible, meet the professional design standard.
2). Operator training
During the installing and commissioning period, supplier arrange time to training buyer’s operator including operation, maintenance etc. supplier should solve the buyer technical questions about operation, maintenance and technics etc. Operator trained by supplier should do his commitment independently.
MACHINE QUALITY
Machine design and manufacture performsoccupation standardand comply with the requirement of quality, specification and characters herein this technical regulation.
Guarantee period start from the day the machine acceptance report signing. Period would be one year.
Technical documents which supplier in charge of furnish and handed to use should be consist with technical regulation, and throughout technical, technics, produce, installation and setting.
INSTALLATION, SETTING &. AFTER-SALE-SERVICE
1). Installation and setting;
Manufacturer is in charge of the machines installation &. commissioning. User is request for in charge of the round tickets &.boarding &. necessary salary of the engineers.
2). After-sale-service;
Manufacturer will in charge of the technical service for the whole using life of the machine.
Floor Deck Roll Forming Machine
Steel Bar Cutting and Straightening Machinery
Wire Straight and Cutting Machine
precious metal sheet straightener
PCB Brushing machine
Electro Galvanized Chain Link Fence