API 16C choke manifold

Model manifold Mining Machinery Parts Jiangsu,China(Mainland) Ref 10317291

Price on request

Pricing is provided on request — use the quote form below.

Port
Shanghai
Minimum Order Quantity
1 Set/Sets
Supply Ability
260 Set/Sets per Month
Payment Terms
T/T

Request a Quote

Product: API 16C choke manifold

Attachment optional · PDF, Word, Excel, image · max 10 MB
No file chosen
We usually reply within 12 hours.

Key features

API 16C choke manifold, 14, 21, 35, 70, 105Mpa

Specifications

Place of Origin Jiangsu China (Mainland) Model Number manifold
Type choke manifold Machine Type Drilling Tool
Certification API Material Stainless Steel
Processing Type Forging & Casting Use Well Drilling
Details API 16C choke manifold, 14, 21, 35, 70, 105Mpa

Packaging & delivery

Packaging Detailwooden case,wooden pallet, as per customers' requirement
Delivery Detail30~80 days after the PO has been signed

Product description

API 16C choke manifold

Assembly & structure
Choke manifold consists of choke valve, gate valve, pipeline, fittings and pressure gauge etc.

Working principle
When the pressure rising in well, fluid in well can be released in utilization of the choke valve opening/closing in choke manifold to control casing pressure, which can directly blow out through gate valve as the casing pressure is quite high.

Technical Specifications

Item NameChoke ManifoldKill Manifold
ModelJG/S2-35JG/SY-35JG/SY2-70JG/S2Y2-105YG-35YG-35YG-105
Main path and Side path( in mm)3 1/8×2 1/16(80×52) 4 1/16)×2 9/16(103×65) 4 1/16×3 1/16(103×78)
Working Pressure(mpa)3000(21)
5000(35)
3000(21)
10000(70)
5000(35)10000(70)15000(105)
Working Pressure°C(°F)P.U -29~121 (-20~250)
Working mediumMud Gas(sulfur-hydrogen)
Control typeManual both-wings choke manifoldHydraulic manual both-wings choke manifoldHydraulic manual three-wings choke manifoldHydraulic manual Four-wings choke manifoldBoth-wings atmospheric valve

More Products

Operation requirement
(1)All the working pressures of parts in choke manifold should be matched with the working pressure of the BOP stack used
(2)Choke manifold should be installed at the place where operator approach it conveniently, pressure test should be executed as installation, while the sealing test pressure should equal to the rated working pressure;
(3)Pipeline should be so smooth and straight as possible, the corner of the pipeline should be made of 120°shaped forged steel bent pipe, which should have adequately large bore.
(4)The working pressure gauge should be installed.
(5) In winter, the choke manifold be able to work under a low temp condition.

Delivery

FAQ

What model is this machine?
The model number is manifold.
What type of machine is it?
It is a choke manifold.
What is it made of?
Material: Stainless Steel.
What certifications does it have?
Certification: API.

Related products in Mining Machinery Parts