2013 Cargo Air shower for clean room (manufacture)

Cargo Air shower, 1) Automatic blowing, 2) Electronic interlock, 3) Intelligent air shower, 4) High quality - details see: https://www.machineto.com/2013-cargo-air-shower-for-clean-room-manufacture-10205469
Condition:NewPlace of Origin:Guangdong China (Mainland)Brand Name:RKSModel Number:RKS-AS
Voltage:380V/50HzPower(W):750WDimension(L*W*H):1200(L)*1000(D)*2180(H)mmWeight:400kg
Certification:CE/ISO9001Warranty:2yearsAfter-sales Service Provided:Overseas service center availableInternal work zone:790*930*1910
Pre-filter:75%@5um (G3)Material:Cold-rolled steel plate, Stainless steel 304Lock:Electronic interlockingStainless steel nozzle:16 pcs
HEPA:99.99%@0.3umLighting:40W daylight lamp  
2013 Cargo Air shower for clean room (manufacture)
contact supplier for 2013 Cargo Air shower for clean room (manufacture)


2013 Air shower for clean room (manufacture)

Technical Parameters


MODEL
RKS-1200-AS1
RKS-1200-AS2

RKS-1200-AS3

External dimension(WxDxH)(mm)

1200x1000x2180

1200x2000x2180

1200x3000x2180

Internal work zone(WxDxH)(mm)

790x930x1910

790x1930x1910

790x2930x1910

Person per cycle

1-2 person

2-4 person

3-6 person

The power of fan

380V/50Hz/1W (1fan)

380V/50Hz/1100W (1fan)

380V/50Hz/1100W (1fan)

Air velocity of fan(m ³ /h)

1300

1300

1300

Fan run(r/min)

2800

2800

2800

Nozzle in stainless steel

12PCS

24PCS

36PCS

Wind speed(m/s)

≥ 25-30

≥ 25-30

≥ 25-30

Noise level(dB)

<62

<62

<62

HEPA filter

Size(mm)

625x625x150

625x625x150

625x625x150

Efficiency

99.99%@0.3 μ m

Air velocity(m ³ /h)

1000

1000

1000

Initial resistance(Pa)

<220

<220

<220

Pre-filter

Size(mm)

775x380x17

775x380x17

775x380x17

Efficiency

G3

G3

G3

Efficiency

75%@5 μ m

75%@5 μ m

75%@5 μ m

Initial resistance(Pa)

<30

<30

<30

Parameter

Power supply

380V/50Hz

380V/50Hz

380V/50Hz


Netpower (Kw)

1.5

2.5

3.5

Package:

Container Loading:

2013 Cargo Air shower for clean room (manufacture)
Packaging Detail:Bubble pack + wellpappe + stretch films + wood frame. 1.Packing with plastic 2.Packing with stretch film 3.The out packing with wood
Delivery Detail:15 days after receipt deposit

Related Product for 2013 Cargo Air shower for clean room (manufacture)